


{"id":115748,"date":"2026-07-29T11:51:14","date_gmt":"2026-07-29T06:21:14","guid":{"rendered":"https:\/\/vajiramandravi.com\/current-affairs\/?p=115748"},"modified":"2026-07-29T11:51:14","modified_gmt":"2026-07-29T06:21:14","slug":"koldam-hydro-power-project","status":"publish","type":"post","link":"https:\/\/vajiramandravi.com\/current-affairs\/koldam-hydro-power-project\/","title":{"rendered":"Koldam Hydro Power Project"},"content":{"rendered":"<h2><b>Koldam Hydro Power Project Latest News<\/b><\/h2>\n<p><span style=\"font-weight: 400;\">The Koldam NTPC Hydroelectric Project generated over 3512 million units of power in 2025-26, the highest ever since the project was commissioned.<\/span><\/p>\n<h2><b>About Koldam Hydro Power Project<\/b><\/h2>\n<ul>\n<li style=\"font-weight: 400; text-align: justify;\" aria-level=\"1\"><span style=\"font-weight: 400;\">It is located on the <\/span><a href=\"https:\/\/vajiramandravi.com\/current-affairs\/key-facts-about-sutlej-river\/\" target=\"_blank\"><b>Satluj River <\/b><\/a><span style=\"font-weight: 400;\">in the Bilaspur District of <\/span><b>Himachal Pradesh.<\/b><\/li>\n<li style=\"font-weight: 400; text-align: justify;\" aria-level=\"1\"><span style=\"font-weight: 400;\">It is located just <\/span><b>upstream of the Bhakra reservoir.\u00a0\u00a0<\/b><\/li>\n<li style=\"font-weight: 400; text-align: justify;\" aria-level=\"1\"><span style=\"font-weight: 400;\">The total capacity of the project is <\/span><b>800 MW.<\/b><\/li>\n<li style=\"font-weight: 400; text-align: justify;\" aria-level=\"1\"><span style=\"font-weight: 400;\">The project involved the construction of a 167m-high rock-and-gravel-filled clay-core dam.<\/span><\/li>\n<li style=\"font-weight: 400; text-align: justify;\" aria-level=\"1\"><span style=\"font-weight: 400;\">It also necessitated the construction of an upstream coffer dam as well as a downstream coffer dam.\u00a0<\/span><\/li>\n<li style=\"font-weight: 400; text-align: justify;\" aria-level=\"1\"><span style=\"font-weight: 400;\">The reservoir created by the dam can hold up to 560 million cubic metres of water.\u00a0\u00a0<\/span><\/li>\n<li style=\"font-weight: 400; text-align: justify;\" aria-level=\"1\"><span style=\"font-weight: 400;\">It is <\/span><b>owned and operated <\/b><span style=\"font-weight: 400;\">by <\/span><b>India&#8217;s biggest power utility National Thermal Power Corporation (NTPC).<\/b><\/li>\n<li style=\"font-weight: 400; text-align: justify;\" aria-level=\"1\"><span style=\"font-weight: 400;\">The <\/span><b>output <\/b><span style=\"font-weight: 400;\">from the power plant is<\/span><b> conveyed to the national grid<\/b><span style=\"font-weight: 400;\"> via a 400kV direct current (D\/C) line.\u00a0<\/span><\/li>\n<li style=\"font-weight: 400; text-align: justify;\" aria-level=\"1\"><b>Himachal Pradesh receives 15%<\/b><span style=\"font-weight: 400;\"> of the generated<\/span><b> power free of cost<\/b><span style=\"font-weight: 400;\"> and <\/span><b>12% at bus-bar rate.\u00a0<\/b><\/li>\n<li style=\"font-weight: 400; text-align: justify;\" aria-level=\"1\"><span style=\"font-weight: 400;\">The project also benefits <\/span><b>Delhi, Haryana, Punjab, Rajasthan, Uttar Pradesh, Jammu and Kashmir, and Chandigarh. <\/b><\/li>\n<\/ul>\n<p><b>News<\/b><strong>:<\/strong> <a href=\"https:\/\/money.rediff.com\/news\/market\/koldam-ntpc-hydro-project-record-power-generation-fy26\/51439320260728\" target=\"_blank\" rel=\"nofollow noopener\"><span style=\"font-weight: 400;\"><strong>RED<\/strong><\/span><\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Koldam Hydro Power Project is located on the Satluj River in the Bilaspur District of Himachal Pradesh. Read more about Koldam Hydro Power Project, River, Capacity, Latest News.<\/p>\n","protected":false},"author":23,"featured_media":115789,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[1],"tags":[9053],"class_list":["post-115748","post","type-post","status-publish","format-standard","has-post-thumbnail","category-upsc-prelims-current-affairs","tag-koldam-hydro-power-project","no-featured-image-padding"],"acf":[],"_links":{"self":[{"href":"https:\/\/vajiramandravi.com\/current-affairs\/wp-json\/wp\/v2\/posts\/115748","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/vajiramandravi.com\/current-affairs\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/vajiramandravi.com\/current-affairs\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/vajiramandravi.com\/current-affairs\/wp-json\/wp\/v2\/users\/23"}],"replies":[{"embeddable":true,"href":"https:\/\/vajiramandravi.com\/current-affairs\/wp-json\/wp\/v2\/comments?post=115748"}],"version-history":[{"count":4,"href":"https:\/\/vajiramandravi.com\/current-affairs\/wp-json\/wp\/v2\/posts\/115748\/revisions"}],"predecessor-version":[{"id":115783,"href":"https:\/\/vajiramandravi.com\/current-affairs\/wp-json\/wp\/v2\/posts\/115748\/revisions\/115783"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/vajiramandravi.com\/current-affairs\/wp-json\/wp\/v2\/media\/115789"}],"wp:attachment":[{"href":"https:\/\/vajiramandravi.com\/current-affairs\/wp-json\/wp\/v2\/media?parent=115748"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/vajiramandravi.com\/current-affairs\/wp-json\/wp\/v2\/categories?post=115748"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/vajiramandravi.com\/current-affairs\/wp-json\/wp\/v2\/tags?post=115748"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}