


{"id":127910,"date":"2026-10-07T14:29:03","date_gmt":"2026-10-07T08:59:03","guid":{"rendered":"https:\/\/vajiramandravi.com\/current-affairs\/?p=127910"},"modified":"2026-10-07T14:37:58","modified_gmt":"2026-10-07T09:07:58","slug":"chamkharchhu-i-hydropower-project","status":"publish","type":"post","link":"https:\/\/vajiramandravi.com\/current-affairs\/chamkharchhu-i-hydropower-project\/","title":{"rendered":"Chamkharchhu-I Hydropower Project"},"content":{"rendered":"<h2><b>Chamkharchhu-I Hydropower Project Latest News<\/b><\/h2>\n<p style=\"text-align: justify;\"><span style=\"font-weight: 400;\">Adani Power and Bhutan\u2019s state-owned generation utility, Druk Green Power Corporation Ltd (DGPC), have signed a Shareholders Agreement to develop the 770 MW Chamkharchhu-I Hydroelectric Project in Bhutan.<\/span><\/p>\n<h2><b>About Chamkharchhu-I Hydropower Project<\/b><\/h2>\n<ul>\n<li style=\"text-align: justify;\"><span style=\"font-weight: 400;\">It is a <\/span><b>770 MW run-of-river<\/b><span style=\"font-weight: 400;\"> hydropower project planned on the <\/span><b>Chamkharchhu River<\/b><span style=\"font-weight: 400;\"> in the Zhemgang district of <\/span><b>central Bhutan.\u00a0<\/b><\/li>\n<li style=\"text-align: justify;\"><span style=\"font-weight: 400;\">The project will be developed through a <\/span><b>49:51 equity partnership<\/b><span style=\"font-weight: 400;\">, with <\/span><b>Adani Power holding 49% <\/b><span style=\"font-weight: 400;\">and <\/span><b>Bhutan\u2019s state-owned DGPC holding 51%.<\/b><span style=\"font-weight: 400;\">\u00a0<\/span><\/li>\n<li style=\"text-align: justify;\"><span style=\"font-weight: 400;\">It will be implemented under the <\/span><a href=\"https:\/\/vajiramandravi.com\/current-affairs\/bot\/\" target=\"_blank\"><b>Build, Own, Operate, and Transfer (BOOT) model<\/b><\/a><span style=\"font-weight: 400;\"> and will have a <\/span><b>30-year concession<\/b><span style=\"font-weight: 400;\"> from the date of commercial operation (COD).\u00a0\u00a0<\/span><\/li>\n<li style=\"text-align: justify;\"><span style=\"font-weight: 400;\">Key project components include a 108-m <\/span><b>concrete gravity dam<\/b><span style=\"font-weight: 400;\">, a 19.2-km headrace tunnel, and an underground powerhouse.<\/span><\/li>\n<li style=\"text-align: justify;\"><span style=\"font-weight: 400;\">Chamkharchhu-I is expected to help <\/span><b>meet Bhutan\u2019s peak winter electricity requirements<\/b><span style=\"font-weight: 400;\"> while enabling <\/span><b>surplus generation<\/b><span style=\"font-weight: 400;\"> to be <\/span><b>exported to India during the summer. <\/b><\/li>\n<\/ul>\n<p><b>News: <\/b><a href=\"https:\/\/www.thehindubusinessline.com\/companies\/adani-power-bhutans-dgpc-sign-pact-for-770-mw-chamkharchhu-i-hydropower-project\/article71549898.ece\" target=\"_blank\" rel=\"nofollow noopener\"><b>HBL<\/b><\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Chamkharchhu-I Hydropower Project is a 770 MW run-of-river hydropower project planned on the Chamkharchhu River in the Zhemgang district of central Bhutan.<\/p>\n","protected":false},"author":23,"featured_media":127918,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[1],"tags":[10727,246,21,22],"class_list":["post-127910","post","type-post","status-publish","format-standard","has-post-thumbnail","category-upsc-prelims-current-affairs","tag-chamkharchhu-i-hydropower-project","tag-prelims-current-affairs","tag-prelims-pointers","tag-upsc-current-affairs","no-featured-image-padding"],"acf":[],"_links":{"self":[{"href":"https:\/\/vajiramandravi.com\/current-affairs\/wp-json\/wp\/v2\/posts\/127910","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/vajiramandravi.com\/current-affairs\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/vajiramandravi.com\/current-affairs\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/vajiramandravi.com\/current-affairs\/wp-json\/wp\/v2\/users\/23"}],"replies":[{"embeddable":true,"href":"https:\/\/vajiramandravi.com\/current-affairs\/wp-json\/wp\/v2\/comments?post=127910"}],"version-history":[{"count":4,"href":"https:\/\/vajiramandravi.com\/current-affairs\/wp-json\/wp\/v2\/posts\/127910\/revisions"}],"predecessor-version":[{"id":127955,"href":"https:\/\/vajiramandravi.com\/current-affairs\/wp-json\/wp\/v2\/posts\/127910\/revisions\/127955"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/vajiramandravi.com\/current-affairs\/wp-json\/wp\/v2\/media\/127918"}],"wp:attachment":[{"href":"https:\/\/vajiramandravi.com\/current-affairs\/wp-json\/wp\/v2\/media?parent=127910"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/vajiramandravi.com\/current-affairs\/wp-json\/wp\/v2\/categories?post=127910"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/vajiramandravi.com\/current-affairs\/wp-json\/wp\/v2\/tags?post=127910"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}