


{"id":19890,"date":"2025-12-14T14:15:09","date_gmt":"2025-12-14T08:45:09","guid":{"rendered":"https:\/\/vajiramandravi.com\/current-affairs\/?p=19890"},"modified":"2025-12-15T16:15:41","modified_gmt":"2025-12-15T10:45:41","slug":"ratle-hydro-electric-project","status":"publish","type":"post","link":"https:\/\/vajiramandravi.com\/current-affairs\/ratle-hydro-electric-project\/","title":{"rendered":"Ratle Hydroelectric Project"},"content":{"rendered":"<h2><b>Ratle Hydroelectric Project Latest News<\/b><\/h2>\n<p style=\"text-align: justify;\"><span style=\"font-weight: 400;\">Megha Engineering and Infrastructures Ltd. (MEIL), which is constructing the Ratle Hydroelectric Project recently said it may pull out of the project if the administration failed to stop threats and interference from locals and politicians.<\/span><\/p>\n<h2><b>About Ratle Hydroelectric Project<\/b><\/h2>\n<ul>\n<li style=\"font-weight: 400; text-align: justify;\" aria-level=\"1\"><span style=\"font-weight: 400;\">It is an <\/span><b>850 MW run-of-river<\/b><span style=\"font-weight: 400;\"> hydroelectric power project being built on the <\/span><b>Chenab River <\/b><span style=\"font-weight: 400;\">in the Kishtwar District of <\/span><b>Jammu &amp; Kashmir.<\/b><\/li>\n<li style=\"font-weight: 400; text-align: justify;\" aria-level=\"1\"><span style=\"font-weight: 400;\">The project is <\/span><b>implemented by <\/b><span style=\"font-weight: 400;\">the <\/span><b>Ratle Hydroelectric Power Corporation (RHPCL).<\/b>\n<ul>\n<li style=\"font-weight: 400;\" aria-level=\"2\"><span style=\"font-weight: 400;\">RHPCL was formed as a<\/span><b> joint venture (JV)<\/b><span style=\"font-weight: 400;\"> between <\/span><b>Jammu &amp; Kashmir State Power Development Corporation (JKSPDC)<\/b><span style=\"font-weight: 400;\"> and India\u2019s state-owned <\/span><b>National Hydroelectric Power Corporation (NHPC).<\/b><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"2\"><b>NHPC and JKSPDC <\/b><span style=\"font-weight: 400;\">hold<\/span><b> 51% and 49% equity<\/b><span style=\"font-weight: 400;\"> ownership in RHPCL, respectively.<\/span><\/li>\n<\/ul>\n<\/li>\n<li style=\"font-weight: 400; text-align: justify;\" aria-level=\"1\"><span style=\"font-weight: 400;\">The <\/span><b>construction work <\/b><span style=\"font-weight: 400;\">is being undertaken by <\/span><b>Megha Engineering and Infrastructure Limited (MEIL).<\/b><\/li>\n<li style=\"font-weight: 400; text-align: justify;\" aria-level=\"1\"><span style=\"font-weight: 400;\">The project includes a 133-meter-tall and 194.8-meter-long<\/span><b> concrete gravity dam,<\/b><span style=\"font-weight: 400;\"> a diversion dam, and an <\/span><b>underground powerhouse <\/b><span style=\"font-weight: 400;\">on the right bank of the river.<\/span><\/li>\n<li style=\"font-weight: 400; text-align: justify;\" aria-level=\"1\"><span style=\"font-weight: 400;\">The underground powerhouse measuring 168 m x 24.5 m x 49 m will house four 205 MW Francis turbine-generating units and a 30 MW auxiliary turbine-generating unit.<\/span><\/li>\n<li style=\"font-weight: 400; text-align: justify;\" aria-level=\"1\"><span style=\"font-weight: 400;\">The project is expected to generate 3,137 GWh of electricity.<\/span><\/li>\n<li style=\"font-weight: 400; text-align: justify;\" aria-level=\"1\"><b style=\"font-size: inherit;\">Pakistan <\/b><span style=\"font-weight: 400;\">has <\/span><b style=\"font-size: inherit;\">frequently alleged<\/b><span style=\"font-weight: 400;\"> that the<\/span><b style=\"font-size: inherit;\"> project violates <\/b><span style=\"font-weight: 400;\">the<\/span><b style=\"font-size: inherit;\"> Indus Waters Treaty of 1960.<\/b><\/li>\n<\/ul>\n<p><b>Source: <\/b><strong><a href=\"https:\/\/www.thehindu.com\/news\/national\/jammu-and-kashmir\/miel-threatens-to-pull-out-of-850mw-ratle-power-project-in-jk-if-threats-political-interferences-not-stopped\/article70392654.ece\" target=\"_blank\" rel=\"nofollow noopener\">TH<\/a><\/strong><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Ratle Hydroelectric Project is an 850 MW run-of-river hydroelectric power project being built on the Chenab River in the Kishtwar District of Jammu &#038; Kashmir. Read more about Ratle Hydroelectric Project, Capacity, Location, Latest News<\/p>\n","protected":false},"author":5,"featured_media":62465,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[1],"tags":[21,2566,22,23],"class_list":{"0":"post-19890","1":"post","2":"type-post","3":"status-publish","4":"format-standard","5":"has-post-thumbnail","7":"category-upsc-prelims-current-affairs","8":"tag-prelims-pointers","9":"tag-ratle-hydroelectric-project","10":"tag-upsc-current-affairs","11":"tag-upsc-prelims-current-affairs","12":"no-featured-image-padding"},"acf":[],"_links":{"self":[{"href":"https:\/\/vajiramandravi.com\/current-affairs\/wp-json\/wp\/v2\/posts\/19890","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/vajiramandravi.com\/current-affairs\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/vajiramandravi.com\/current-affairs\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/vajiramandravi.com\/current-affairs\/wp-json\/wp\/v2\/users\/5"}],"replies":[{"embeddable":true,"href":"https:\/\/vajiramandravi.com\/current-affairs\/wp-json\/wp\/v2\/comments?post=19890"}],"version-history":[{"count":0,"href":"https:\/\/vajiramandravi.com\/current-affairs\/wp-json\/wp\/v2\/posts\/19890\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/vajiramandravi.com\/current-affairs\/wp-json\/wp\/v2\/media\/62465"}],"wp:attachment":[{"href":"https:\/\/vajiramandravi.com\/current-affairs\/wp-json\/wp\/v2\/media?parent=19890"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/vajiramandravi.com\/current-affairs\/wp-json\/wp\/v2\/categories?post=19890"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/vajiramandravi.com\/current-affairs\/wp-json\/wp\/v2\/tags?post=19890"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}