


{"id":31590,"date":"2026-09-22T12:14:59","date_gmt":"2026-09-22T06:44:59","guid":{"rendered":"https:\/\/vajiramandravi.com\/current-affairs\/?p=31590"},"modified":"2026-09-22T15:27:53","modified_gmt":"2026-09-22T09:57:53","slug":"parbati-ii-hydroelectric-project","status":"publish","type":"post","link":"https:\/\/vajiramandravi.com\/current-affairs\/parbati-ii-hydroelectric-project\/","title":{"rendered":"Parbati-II Hydroelectric Project"},"content":{"rendered":"<h2><b>Parbati-II Hydroelectric Project Latest News<\/b><\/h2>\n<p style=\"text-align: justify;\"><span style=\"font-weight: 400;\">A water leakage from the Parbati-II hydropower project flooded areas near Rella village in Himachal Pradesh\u2019s Kullu district recently, damaging houses and agriculture fields and forcing residents to flee. <\/span><\/p>\n<h2><b>About Parbati-II Hydroelectric Project<\/b><\/h2>\n<ul>\n<li style=\"text-align: justify;\"><span style=\"font-weight: 400;\">It is a <\/span><b>run-of-the-river project <\/b><span style=\"font-weight: 400;\">under construction on the <\/span><b>Parbati River<\/b><span style=\"font-weight: 400;\"> (major<\/span><b> tributary of the <\/b><strong><a href=\"https:\/\/vajiramandravi.com\/current-affairs\/about-beas-river\/\" target=\"_blank\">Beas <\/a><\/strong><span style=\"font-weight: 400;\"><strong><a href=\"https:\/\/vajiramandravi.com\/current-affairs\/about-beas-river\/\" target=\"_blank\">River<\/a><\/strong>), in the <\/span><b>Kullu District <\/b><span style=\"font-weight: 400;\">of <\/span><b>Himachal Pradesh.<\/b><\/li>\n<li style=\"text-align: justify;\"><span style=\"font-weight: 400;\">By constructing an 83.7 m high <\/span><b>concrete gravity dam<\/b><span style=\"font-weight: 400;\"> near Pulga village in the Manikaran valley, the <\/span><b>flow of the Parbati River is diverted,<\/b><span style=\"font-weight: 400;\"> and the water is being taken to Sainj Valley through a 31.56 km long headrace tunnel, where a powerhouse has been constructed at Siund village.\u00a0<\/span><\/li>\n<li style=\"text-align: justify;\"><span style=\"font-weight: 400;\">\u00a0The 31.56 km long HRT of the project is the <\/span><b>longest hydroelectric tunnel in India.\u00a0\u00a0<\/b><\/li>\n<li style=\"text-align: justify;\"><span style=\"font-weight: 400;\">The<\/span> <span style=\"font-weight: 400;\">water flow of Parbati is further increased by the mixing of water from five nalas coming along the head race tunnel.\u00a0\u00a0<\/span><\/li>\n<li style=\"text-align: justify;\"><b>Total Capacity: 800 MW<\/b><span style=\"font-weight: 400;\"> (four units of 200 MW each)<\/span><\/li>\n<li style=\"text-align: justify;\"><span style=\"font-weight: 400;\">Once fully commissioned, it is expected to generate approx. 3,074 million units (MU) of electricity annually.<\/span><\/li>\n<li style=\"text-align: justify;\"><span style=\"font-weight: 400;\">The project is being <\/span><b>developed<\/b><span style=\"font-weight: 400;\"> and currently <\/span><b>owned by National Hydroelectric Power Corporation Private Limited (NHPC). <\/b><span style=\"font-weight: 400;\">The company has a <\/span><b>stake of 100%.<\/b><\/li>\n<li style=\"text-align: justify;\"><b>Himachal Pradesh<\/b><span style=\"font-weight: 400;\"> will <\/span><b>get 12% free power <\/b><span style=\"font-weight: 400;\">from the project, and the additional 1% free power will be used for the Local Area Development Fund. <\/span><\/li>\n<\/ul>\n<p><b>News: <\/b><a href=\"https:\/\/timesofindia.indiatimes.com\/city\/chandigarh\/valve-failure-at-hydro-project-triggers-flooding-in-kullu-village\/amp_articleshow\/134372910.cms\" target=\"_blank\" rel=\"nofollow noopener\"><b>TOI<\/b><\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Parbati-II Hydroelectric Project is a run-of-the-river project under construction on the Parbati River (major tributary of the Beas River), in the Kullu District of Himachal Pradesh.<\/p>\n","protected":false},"author":5,"featured_media":31591,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[1],"tags":[10420,21,22,23],"class_list":["post-31590","post","type-post","status-publish","format-standard","has-post-thumbnail","category-upsc-prelims-current-affairs","tag-parbati-ii-hydroelectric-project","tag-prelims-pointers","tag-upsc-current-affairs","tag-upsc-prelims-current-affairs","no-featured-image-padding"],"acf":[],"_links":{"self":[{"href":"https:\/\/vajiramandravi.com\/current-affairs\/wp-json\/wp\/v2\/posts\/31590","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/vajiramandravi.com\/current-affairs\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/vajiramandravi.com\/current-affairs\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/vajiramandravi.com\/current-affairs\/wp-json\/wp\/v2\/users\/5"}],"replies":[{"embeddable":true,"href":"https:\/\/vajiramandravi.com\/current-affairs\/wp-json\/wp\/v2\/comments?post=31590"}],"version-history":[{"count":3,"href":"https:\/\/vajiramandravi.com\/current-affairs\/wp-json\/wp\/v2\/posts\/31590\/revisions"}],"predecessor-version":[{"id":125706,"href":"https:\/\/vajiramandravi.com\/current-affairs\/wp-json\/wp\/v2\/posts\/31590\/revisions\/125706"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/vajiramandravi.com\/current-affairs\/wp-json\/wp\/v2\/media\/31591"}],"wp:attachment":[{"href":"https:\/\/vajiramandravi.com\/current-affairs\/wp-json\/wp\/v2\/media?parent=31590"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/vajiramandravi.com\/current-affairs\/wp-json\/wp\/v2\/categories?post=31590"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/vajiramandravi.com\/current-affairs\/wp-json\/wp\/v2\/tags?post=31590"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}