


{"id":4593,"date":"2026-06-19T11:34:43","date_gmt":"2026-06-19T06:04:43","guid":{"rendered":"https:\/\/vajiramandravi.com\/current-affairs\/?p=4593"},"modified":"2026-06-19T13:05:51","modified_gmt":"2026-06-19T07:35:51","slug":"etalin-hydroelectric-project","status":"publish","type":"post","link":"https:\/\/vajiramandravi.com\/current-affairs\/etalin-hydroelectric-project\/","title":{"rendered":"Etalin Hydroelectric Project"},"content":{"rendered":"<h2><b>Etalin Hydroelectric Project Latest News<\/b><\/h2>\n<p style=\"text-align: justify;\"><span style=\"font-weight: 400;\">NHPC Limited recently signed a Memorandum of Agreement (MoA) with the Government of Arunachal Pradesh for the development of the 3,097 MW Etalin Hydroelectric Project.<\/span><\/p>\n<h2><b>About Etalin Hydroelectric Project<\/b><\/h2>\n<ul>\n<li style=\"text-align: justify;\"><span style=\"font-weight: 400;\">It is a <\/span><b>3,097 MW<\/b><span style=\"font-weight: 400;\"> hydropower project planned on the <\/span><b>Dri and Talo rivers (tributaries of the <a href=\"https:\/\/vajiramandravi.com\/current-affairs\/dibang-river\/\" target=\"_blank\">Dibang River<\/a><\/b><span style=\"font-weight: 400;\">) in <\/span><b>Arunachal Pradesh\u2019s Dibang Valley.<\/b><\/li>\n<li style=\"text-align: justify;\"><span style=\"font-weight: 400;\">It is <\/span><b>one of the largest hydropower projects <\/b><span style=\"font-weight: 400;\">proposed in the country in terms of installed capacity.<\/span><\/li>\n<li style=\"text-align: justify;\"><span style=\"font-weight: 400;\">It is proposed to be developed as a <\/span><b>combination of two run-of-the-river schemes, <\/b><span style=\"font-weight: 400;\">involving the construction of <\/span><b>concrete gravity dams on the Dri River and Talo River,<\/b><span style=\"font-weight: 400;\"> with an <\/span><b>underground powerhouse<\/b><span style=\"font-weight: 400;\"> near their confluence close to Etalin village.<\/span><\/li>\n<li style=\"text-align: justify;\"><span style=\"font-weight: 400;\">The project is expected to generate 12,752 GWh of electricity.<\/span><\/li>\n<li style=\"text-align: justify;\"><span style=\"font-weight: 400;\">The project area falls under the <\/span><b>\u201crichest biogeographical province of the Himalayan zone\u201d <\/b><span style=\"font-weight: 400;\">and \u201cone of the <\/span><b>mega-biodiversity hotspots of the world\u201d.<\/b><\/li>\n<li style=\"text-align: justify;\"><span style=\"font-weight: 400;\">The <\/span><b>project are<\/b><span style=\"font-weight: 400;\">a is <\/span><b>dominated <\/b><span style=\"font-weight: 400;\">by indigenous populations belonging to <\/span><b>Idu-Mishmi tribes.<\/b><\/li>\n<li style=\"text-align: justify;\"><span style=\"font-weight: 400;\">The project is being <\/span><b>executed by NHPC Limited<\/b><span style=\"font-weight: 400;\"> (formerly known as the National Hydroelectric Power Corporation).<\/span>\n<ul>\n<li style=\"text-align: justify;\"><span style=\"font-weight: 400;\">The project will be implemented on a <\/span><b>Build, Own, Operate, and Transfer (BOOT) basis.\u00a0<\/b><\/li>\n<li style=\"text-align: justify;\"><span style=\"font-weight: 400;\">NHPC will be responsible for developing and operating the project for a <\/span><b>lease period of 40 years <\/b><span style=\"font-weight: 400;\">from the Commercial Operation Date (COD). <\/span><\/li>\n<\/ul>\n<\/li>\n<\/ul>\n<p><b>News<\/b><span style=\"font-weight: 400;\">: <\/span><strong><a href=\"https:\/\/psuwatch.com\/amp\/story\/newsupdates\/nhpc-signs-moa-with-govt-of-arunachal-for-3097-mw-etalin-hydroelectric-project\" target=\"_blank\" rel=\"nofollow noopener\">PSU<\/a><\/strong><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Etalin Hydroelectric Project is a 3,097 MW hydropower project planned on the Dri and Talo rivers (tributaries of the Dibang River) in Arunachal Pradesh\u2019s Dibang Valley. Read m0re about Etalin Hydroelectric Project, Location, Rivers, Capacity, Latest News.<\/p>\n","protected":false},"author":5,"featured_media":32155,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[1],"tags":[154,21,22,23],"class_list":["post-4593","post","type-post","status-publish","format-standard","has-post-thumbnail","category-upsc-prelims-current-affairs","tag-etalin-hydroelectric-project","tag-prelims-pointers","tag-upsc-current-affairs","tag-upsc-prelims-current-affairs","no-featured-image-padding"],"acf":[],"_links":{"self":[{"href":"https:\/\/vajiramandravi.com\/current-affairs\/wp-json\/wp\/v2\/posts\/4593","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/vajiramandravi.com\/current-affairs\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/vajiramandravi.com\/current-affairs\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/vajiramandravi.com\/current-affairs\/wp-json\/wp\/v2\/users\/5"}],"replies":[{"embeddable":true,"href":"https:\/\/vajiramandravi.com\/current-affairs\/wp-json\/wp\/v2\/comments?post=4593"}],"version-history":[{"count":3,"href":"https:\/\/vajiramandravi.com\/current-affairs\/wp-json\/wp\/v2\/posts\/4593\/revisions"}],"predecessor-version":[{"id":108829,"href":"https:\/\/vajiramandravi.com\/current-affairs\/wp-json\/wp\/v2\/posts\/4593\/revisions\/108829"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/vajiramandravi.com\/current-affairs\/wp-json\/wp\/v2\/media\/32155"}],"wp:attachment":[{"href":"https:\/\/vajiramandravi.com\/current-affairs\/wp-json\/wp\/v2\/media?parent=4593"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/vajiramandravi.com\/current-affairs\/wp-json\/wp\/v2\/categories?post=4593"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/vajiramandravi.com\/current-affairs\/wp-json\/wp\/v2\/tags?post=4593"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}