


{"id":47258,"date":"2026-08-07T12:00:15","date_gmt":"2026-08-07T06:30:15","guid":{"rendered":"https:\/\/vajiramandravi.com\/current-affairs\/?p=47258"},"modified":"2026-08-07T14:52:41","modified_gmt":"2026-08-07T09:22:41","slug":"pakal-dul-hydropower-project","status":"publish","type":"post","link":"https:\/\/vajiramandravi.com\/current-affairs\/pakal-dul-hydropower-project\/","title":{"rendered":"Pakal Dul Hydropower Project"},"content":{"rendered":"<h2><b>Pakal Dul Hydroelectric Project Latest News<\/b><\/h2>\n<p style=\"text-align: justify;\"><span style=\"font-weight: 400;\">A significant industrial dispute involving workers engaged by L&amp;T Construction through subcontractors at the Pakal Dul Hydroelectric Project, Kishtwar, Jammu &amp; Kashmir, has been amicably resolved recently.<\/span><\/p>\n<h2><b>About Pakal Dul Hydroelectric Project<\/b><\/h2>\n<ul>\n<li style=\"text-align: justify;\"><span style=\"font-weight: 400;\">It is a <\/span><b>1 GW run-of-the-river scheme<\/b><span style=\"font-weight: 400;\"> hydroelectric project (HEP) under construction in the <\/span><b>Kishtwar district of Jammu and Kashmir.<\/b><\/li>\n<li style=\"text-align: justify;\"><span style=\"font-weight: 400;\">The project is being constructed on the <\/span><b>Marusudar River, <\/b><span style=\"font-weight: 400;\">a <\/span><b>tributary of <a href=\"https:\/\/vajiramandravi.com\/current-affairs\/chenab-river\/\" target=\"_blank\">the Chenab<\/a><\/b><span style=\"font-weight: 400;\">.<\/span><\/li>\n<li style=\"text-align: justify;\"><span style=\"font-weight: 400;\">It comprises a 167 m high<\/span><b> concrete-face rockfill dam <\/b><span style=\"font-weight: 400;\">and an <\/span><b>underground powerhouse.<\/b><\/li>\n<li style=\"text-align: justify;\"><span style=\"font-weight: 400;\">The underground powerhouse will be equipped with four 250 MW Francis turbine units operating at a net head of 397.3 m.<\/span><\/li>\n<li style=\"text-align: justify;\"><span style=\"font-weight: 400;\">It is anticipated to produce around 3,330 million units of energy a year.<\/span><\/li>\n<li style=\"text-align: justify;\"><span style=\"font-weight: 400;\">It is being constructed by<\/span><b> Chenab Valley Power Projects [P] Ltd. (CVPPL)<\/b><span style=\"font-weight: 400;\">, a <\/span><b>joint venture <\/b><span style=\"font-weight: 400;\">company of National Hydroelectric Power Corporation <\/span><b>(NHPC Limited) and Jammu &amp; Kashmir State Power Development Corporation Ltd (JKSPDC).<\/b><\/li>\n<li style=\"text-align: justify;\"><b>JKSPDC holds a 49% stake<\/b><span style=\"font-weight: 400;\"> in CVPPL, while <\/span><b>NHPC and PTC India hold 49% and 2%, <\/b><span style=\"font-weight: 400;\">respectively.<\/span><\/li>\n<li style=\"text-align: justify;\"><span style=\"font-weight: 400;\">During the<\/span><b> first ten years<\/b><span style=\"font-weight: 400;\"> of operation, the <\/span><b>J&amp;K will receive 12% free power<\/b><span style=\"font-weight: 400;\"> from the project, in addition to waiving water usage charges.\u00a0<\/span><\/li>\n<li style=\"text-align: justify;\"><b>J&amp;K <\/b><span style=\"font-weight: 400;\">will also have the<\/span><b> first right to purchase the power<\/b><span style=\"font-weight: 400;\"> allotted to NHPC and PTC.<\/span><\/li>\n<\/ul>\n<p><strong>News: <a href=\"https:\/\/www.pib.gov.in\/PressReleasePage.aspx?PRID=2294825&amp;reg=48&amp;lang=2\" target=\"_blank\" rel=\"nofollow noopener\">PIB<\/a><\/strong><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Pakal Dul Hydroelectric Project is a 1 GW run-of-the-river scheme hydroelectric project (HEP) under construction in the Kishtwar district of Jammu and Kashmir.<\/p>\n","protected":false},"author":8,"featured_media":47259,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[1],"tags":[9349,21,22,23],"class_list":["post-47258","post","type-post","status-publish","format-standard","has-post-thumbnail","category-upsc-prelims-current-affairs","tag-pakal-dul-hydropower-project","tag-prelims-pointers","tag-upsc-current-affairs","tag-upsc-prelims-current-affairs","no-featured-image-padding"],"acf":[],"_links":{"self":[{"href":"https:\/\/vajiramandravi.com\/current-affairs\/wp-json\/wp\/v2\/posts\/47258","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/vajiramandravi.com\/current-affairs\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/vajiramandravi.com\/current-affairs\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/vajiramandravi.com\/current-affairs\/wp-json\/wp\/v2\/users\/8"}],"replies":[{"embeddable":true,"href":"https:\/\/vajiramandravi.com\/current-affairs\/wp-json\/wp\/v2\/comments?post=47258"}],"version-history":[{"count":3,"href":"https:\/\/vajiramandravi.com\/current-affairs\/wp-json\/wp\/v2\/posts\/47258\/revisions"}],"predecessor-version":[{"id":117804,"href":"https:\/\/vajiramandravi.com\/current-affairs\/wp-json\/wp\/v2\/posts\/47258\/revisions\/117804"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/vajiramandravi.com\/current-affairs\/wp-json\/wp\/v2\/media\/47259"}],"wp:attachment":[{"href":"https:\/\/vajiramandravi.com\/current-affairs\/wp-json\/wp\/v2\/media?parent=47258"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/vajiramandravi.com\/current-affairs\/wp-json\/wp\/v2\/categories?post=47258"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/vajiramandravi.com\/current-affairs\/wp-json\/wp\/v2\/tags?post=47258"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}