


{"id":57495,"date":"2025-11-24T11:52:09","date_gmt":"2025-11-24T06:22:09","guid":{"rendered":"https:\/\/vajiramandravi.com\/current-affairs\/?p=57495"},"modified":"2025-11-24T16:01:43","modified_gmt":"2025-11-24T10:31:43","slug":"dorjilung-hydropower-project","status":"publish","type":"post","link":"https:\/\/vajiramandravi.com\/current-affairs\/dorjilung-hydropower-project\/","title":{"rendered":"Dorjilung Hydroelectric Power Project"},"content":{"rendered":"<h2><b>Dorjilung Hydroelectric Power Project Latest News<\/b><\/h2>\n<p style=\"text-align: justify;\"><span style=\"font-weight: 400;\">Tata Power Company Ltd recently said it has signed commercial agreements with Druk Green Power Corporation Ltd (DGPC) for the development of the 1,125 MW Dorjilung hydroelectric power project in Bhutan. <\/span><\/p>\n<h2><b>About Dorjilung Hydroelectric Power Project<\/b><\/h2>\n<ul>\n<li style=\"font-weight: 400; text-align: justify;\" aria-level=\"1\"><span style=\"font-weight: 400;\">It is a planned 1<\/span><b>125\u202fMW run-of-river project<\/b><span style=\"font-weight: 400;\"> situated in the eastern Lhuentse and Mongar Districts of <\/span><b>Bhutan <\/b><span style=\"font-weight: 400;\">on the <\/span><b>Kurichhu River, <\/b><span style=\"font-weight: 400;\">a <\/span><b>tributary of the Drangmechhu that flows into India.<\/b><\/li>\n<li style=\"font-weight: 400; text-align: justify;\" aria-level=\"1\"><span style=\"font-weight: 400;\">At a height of approximately 139.5\u202fm, the <\/span><b>concrete-gravity dam<\/b><span style=\"font-weight: 400;\"> channels nearly 287\u202fm3\/s through a 15\u202fkm headrace tunnel to an <\/span><b>underground powerhouse <\/b><span style=\"font-weight: 400;\">housing six Francis turbines, designed to generate around 4.5 terawatt-hours (TWh) annually.<\/span><\/li>\n<li style=\"font-weight: 400; text-align: justify;\" aria-level=\"1\"><span style=\"font-weight: 400;\">At a total project cost of <\/span><b>\u20b913,100 crore, <\/b><span style=\"font-weight: 400;\">Dorjilung will be <\/span><b>Bhutan\u2019s second-largest hydropower project, <\/b><span style=\"font-weight: 400;\">and the <\/span><b>largest Public\u2013Private Partnership (<a href=\"https:\/\/vajiramandravi.com\/upsc-exam\/public-private-partnership\/\" target=\"_blank\">PPP<\/a>) hydro project <\/b><span style=\"font-weight: 400;\">ever undertaken in the country.\u00a0<\/span><\/li>\n<li style=\"font-weight: 400; text-align: justify;\" aria-level=\"1\"><span style=\"font-weight: 400;\">The project is <\/span><b>financed by the World Bank.<\/b><\/li>\n<li style=\"font-weight: 400; text-align: justify;\" aria-level=\"1\"><span style=\"font-weight: 400;\">In November 2024, <\/span><b>Bhutan\u2019s Druk Green Power Corporation (DGPC) signed an MoU with Tata Power Company Limited for the joint development of the project.<\/b><\/li>\n<li style=\"font-weight: 400; text-align: justify;\" aria-level=\"1\"><span style=\"font-weight: 400;\">The Project will be implemented through a Special Purpose Vehicle (SPV), with D<\/span><b>GPC and Tata Power holding equity shares of 60% and 40%, respectively.<\/b><\/li>\n<li style=\"font-weight: 400; text-align: justify;\" aria-level=\"1\"><span style=\"font-weight: 400;\">The project is expected to be commissioned by early 2032.<\/span><\/li>\n<\/ul>\n<p><strong>Source: <a href=\"https:\/\/www.cnbctv18.com\/market\/stocks\/tata-power-company-share-price-commits-rs-1572-crore-for-1125-mw-dorjilung-hydropower-project-bhutan-renewable-energy-news-19769010.htm\" target=\"_blank\" rel=\"nofollow noopener\">CNBC<\/a><\/strong><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Dorjilung Hydroelectric Power Project is a planned 1125\u202fMW run-of-river project situated in the eastern Lhuentse and Mongar Districts of Bhutan on the Kurichhu River.<\/p>\n","protected":false},"author":23,"featured_media":57526,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[1],"tags":[3859,21,22,23],"class_list":{"0":"post-57495","1":"post","2":"type-post","3":"status-publish","4":"format-standard","5":"has-post-thumbnail","7":"category-upsc-prelims-current-affairs","8":"tag-dorjilung-hydroelectric-power-project","9":"tag-prelims-pointers","10":"tag-upsc-current-affairs","11":"tag-upsc-prelims-current-affairs","12":"no-featured-image-padding"},"acf":[],"_links":{"self":[{"href":"https:\/\/vajiramandravi.com\/current-affairs\/wp-json\/wp\/v2\/posts\/57495","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/vajiramandravi.com\/current-affairs\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/vajiramandravi.com\/current-affairs\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/vajiramandravi.com\/current-affairs\/wp-json\/wp\/v2\/users\/23"}],"replies":[{"embeddable":true,"href":"https:\/\/vajiramandravi.com\/current-affairs\/wp-json\/wp\/v2\/comments?post=57495"}],"version-history":[{"count":0,"href":"https:\/\/vajiramandravi.com\/current-affairs\/wp-json\/wp\/v2\/posts\/57495\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/vajiramandravi.com\/current-affairs\/wp-json\/wp\/v2\/media\/57526"}],"wp:attachment":[{"href":"https:\/\/vajiramandravi.com\/current-affairs\/wp-json\/wp\/v2\/media?parent=57495"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/vajiramandravi.com\/current-affairs\/wp-json\/wp\/v2\/categories?post=57495"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/vajiramandravi.com\/current-affairs\/wp-json\/wp\/v2\/tags?post=57495"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}