


{"id":73993,"date":"2025-11-18T12:42:14","date_gmt":"2025-11-18T07:12:14","guid":{"rendered":"https:\/\/vajiramandravi.com\/current-affairs\/?p=73993"},"modified":"2025-11-18T13:39:23","modified_gmt":"2025-11-18T08:09:23","slug":"kwar-hydroelectric-project","status":"publish","type":"post","link":"https:\/\/vajiramandravi.com\/current-affairs\/kwar-hydroelectric-project\/","title":{"rendered":"Kwar Hydroelectric Project"},"content":{"rendered":"<h2><b>Kwar Hydroelectric Project Latest News<\/b><\/h2>\n<p style=\"text-align: justify;\"><span style=\"font-weight: 400;\">Several labourers were rescued safely after a truck caught fire inside a tunnel at the Kwar hydroelectric power project on the Chenab river in the mountainous Kishtwar district of the Jammu region recently. <\/span><\/p>\n<h2><b>About Kwar Hydroelectric Project<\/b><\/h2>\n<ul>\n<li style=\"font-weight: 400; text-align: justify;\" aria-level=\"1\"><span style=\"font-weight: 400;\">It is a<\/span><b> 540 MW run-of-river hydropower project.<\/b><\/li>\n<li style=\"font-weight: 400; text-align: justify;\" aria-level=\"1\"><span style=\"font-weight: 400;\">It is located on the <\/span><b>Chenab River<\/b><span style=\"font-weight: 400;\"> in the <\/span><b>Kishtwar district of Jammu and Kashmir.<\/b><\/li>\n<li style=\"font-weight: 400; text-align: justify;\" aria-level=\"1\"><span style=\"font-weight: 400;\">The project is being <\/span><b>developed by Chenab Valley Power Projects Private Ltd (CVPPL).\u00a0<\/b>\n<ul>\n<li style=\"font-weight: 400;\" aria-level=\"2\"><span style=\"font-weight: 400;\">CVPPL is a <\/span><b>joint venture company between NHPC Ltd and Jammu &amp; Kashmir State Power Development Corporation (JKSPDC)<\/b><span style=\"font-weight: 400;\"> with equity contributions of 51 percent and 49 percent, respectively.<\/span><\/li>\n<\/ul>\n<\/li>\n<li style=\"font-weight: 400; text-align: justify;\" aria-level=\"1\"><span style=\"font-weight: 400;\">The project shall generate 1,975.54 million units in a 90 percent dependable year.<\/span><\/li>\n<li style=\"font-weight: 400; text-align: justify;\" aria-level=\"1\"><b style=\"font-size: inherit;\">The Government of India is extending a grant <\/b><span style=\"font-weight: 400;\">of Rs. 69.80 crore towards the cost of enabling Infrastructure and also supporting the Union Territory of Jammu &amp; Kashmir by providing a grant of Rs. 655.08 crore for the equity contribution of JKSPDC (49%) in M\/s. CVPPPL.<\/span><\/li>\n<\/ul>\n<p><strong>Source: <a href=\"https:\/\/www.tribuneindia.com\/news\/j-k\/truck-catches-fire-in-kwar-hydroelectric-project-tunnel\/\" target=\"_blank\" rel=\"nofollow noopener\">TI<\/a><\/strong><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Kwar Hydroelectric Project is a 540 MW run-of-river hydropower project. Read more about Kwar Hydroelectric Project, State, River, Capacity, Latest News.<\/p>\n","protected":false},"author":23,"featured_media":73985,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[1],"tags":[3758,21,22,23],"class_list":{"0":"post-73993","1":"post","2":"type-post","3":"status-publish","4":"format-standard","5":"has-post-thumbnail","7":"category-upsc-prelims-current-affairs","8":"tag-kwar-hydroelectric-project","9":"tag-prelims-pointers","10":"tag-upsc-current-affairs","11":"tag-upsc-prelims-current-affairs","12":"no-featured-image-padding"},"acf":[],"_links":{"self":[{"href":"https:\/\/vajiramandravi.com\/current-affairs\/wp-json\/wp\/v2\/posts\/73993","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/vajiramandravi.com\/current-affairs\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/vajiramandravi.com\/current-affairs\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/vajiramandravi.com\/current-affairs\/wp-json\/wp\/v2\/users\/23"}],"replies":[{"embeddable":true,"href":"https:\/\/vajiramandravi.com\/current-affairs\/wp-json\/wp\/v2\/comments?post=73993"}],"version-history":[{"count":0,"href":"https:\/\/vajiramandravi.com\/current-affairs\/wp-json\/wp\/v2\/posts\/73993\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/vajiramandravi.com\/current-affairs\/wp-json\/wp\/v2\/media\/73985"}],"wp:attachment":[{"href":"https:\/\/vajiramandravi.com\/current-affairs\/wp-json\/wp\/v2\/media?parent=73993"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/vajiramandravi.com\/current-affairs\/wp-json\/wp\/v2\/categories?post=73993"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/vajiramandravi.com\/current-affairs\/wp-json\/wp\/v2\/tags?post=73993"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}