


{"id":81736,"date":"2026-10-23T12:22:55","date_gmt":"2026-10-23T06:52:55","guid":{"rendered":"https:\/\/vajiramandravi.com\/current-affairs\/?p=81736"},"modified":"2026-10-23T12:25:31","modified_gmt":"2026-10-23T06:55:31","slug":"kamala-hydroelectric-project","status":"publish","type":"post","link":"https:\/\/vajiramandravi.com\/current-affairs\/kamala-hydroelectric-project\/","title":{"rendered":"Kamala Hydroelectric Project"},"content":{"rendered":"<h2><b>Kamala Hydroelectric Project Latest News<\/b><\/h2>\n<p style=\"text-align: justify;\"><span style=\"font-weight: 400;\">National Hydroelectric Power Corporation (NHPC) has sought clearance from the Union Environment Ministry to divert 3,278 hectares of high-conservation-value forest in the lower Himalayas region of Arunachal Pradesh for its Kamala hydroelectric project. <\/span><\/p>\n<h2><b>About Kamala Hydroelectric Project<\/b><\/h2>\n<ul>\n<li style=\"text-align: justify;\"><span style=\"font-weight: 400;\">Kamala Hydroelectric Project (<\/span><b>formerly Subansiri Middle Hydroelectric Project<\/b><span style=\"font-weight: 400;\">) is a <\/span><b>1,720 MW<\/b><span style=\"font-weight: 400;\"> hydroelectric project planned on the <\/span><b>Kamala River<\/b><span style=\"font-weight: 400;\"> (a major <\/span><b>tributary of the Subansiri<\/b><span style=\"font-weight: 400;\"> River) in <\/span><b>Arunachal Pradesh<\/b><span style=\"font-weight: 400;\">\u2018s Kamle district.<\/span><\/li>\n<li style=\"text-align: justify;\"><span style=\"font-weight: 400;\">It is a<\/span><b> storage-based scheme<\/b><span style=\"font-weight: 400;\"> with a<\/span><b> flood moderation component.<\/b><\/li>\n<li style=\"text-align: justify;\"><span style=\"font-weight: 400;\">The project involves construction of a 216-metre-high <\/span><b>concrete gravity dam<\/b><span style=\"font-weight: 400;\"> and an <\/span><b>underground powerhouse.<\/b><\/li>\n<li style=\"text-align: justify;\"><span style=\"font-weight: 400;\">The project will generate 6,869.92 MU of green energy annually on completion.<\/span><\/li>\n<li style=\"text-align: justify;\"><span style=\"font-weight: 400;\">In addition to power generation, the project also envisaged to provide <\/span><b>flood relief in the Brahmaputra valley.<\/b><\/li>\n<li style=\"text-align: justify;\"><span style=\"font-weight: 400;\">The project will be implemented on a <\/span><b>Build-Own-Operate-Transfer (BOOT) basis <\/b><span style=\"font-weight: 400;\">through a <\/span><b>joint venture company <\/b><span style=\"font-weight: 400;\">with <\/span><b>74% equity by NHPC<\/b><span style=\"font-weight: 400;\"> and <\/span><b>26% by the Govt of Arunachal Pradesh (GoAP).<\/b><\/li>\n<li style=\"text-align: justify;\"><span style=\"font-weight: 400;\">The completion cost of the project is estimated at Rs 26,069.50 crore.<\/span><\/li>\n<li style=\"text-align: justify;\"><span style=\"font-weight: 400;\">The project is proposed to be <\/span><b>financed <\/b><span style=\"font-weight: 400;\">with a<\/span><b> debt-equity ratio of 70:30,<\/b> <b>supported by Government of India grants <\/b><span style=\"font-weight: 400;\">for enabling infrastructure (Rs 1,340 crore) and flood moderation component (Rs 4,743.98 crore), along with 100% SGST reimbursement by GoAP.\u00a0<\/span><\/li>\n<li style=\"text-align: justify;\"><span style=\"font-weight: 400;\">The <\/span><b>State will receive 12% free power<\/b><span style=\"font-weight: 400;\"> and an <\/span><b>additional 1% earmarked for the Local Area Development Fund (LADF).<\/b><\/li>\n<\/ul>\n<p><b>News: <\/b><a href=\"https:\/\/indianexpress.com\/article\/india\/kamala-hydel-project-arunachal-pradesh-forest-clearance-nhpc-10931256\/\" target=\"_blank\" rel=\"nofollow noopener\"><b>IE<\/b><\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Kamala Hydroelectric Project is a 1,720 MW hydroelectric project planned on the Kamala River (a major tributary of the Subansiri River) in Arunachal Pradesh\u2018s Kamle district.<\/p>\n","protected":false},"author":23,"featured_media":130254,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[1],"tags":[4648,21,23],"class_list":["post-81736","post","type-post","status-publish","format-standard","has-post-thumbnail","category-upsc-prelims-current-affairs","tag-kamala-hydroelectric-project","tag-prelims-pointers","tag-upsc-prelims-current-affairs","no-featured-image-padding"],"acf":[],"_links":{"self":[{"href":"https:\/\/vajiramandravi.com\/current-affairs\/wp-json\/wp\/v2\/posts\/81736","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/vajiramandravi.com\/current-affairs\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/vajiramandravi.com\/current-affairs\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/vajiramandravi.com\/current-affairs\/wp-json\/wp\/v2\/users\/23"}],"replies":[{"embeddable":true,"href":"https:\/\/vajiramandravi.com\/current-affairs\/wp-json\/wp\/v2\/comments?post=81736"}],"version-history":[{"count":2,"href":"https:\/\/vajiramandravi.com\/current-affairs\/wp-json\/wp\/v2\/posts\/81736\/revisions"}],"predecessor-version":[{"id":130280,"href":"https:\/\/vajiramandravi.com\/current-affairs\/wp-json\/wp\/v2\/posts\/81736\/revisions\/130280"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/vajiramandravi.com\/current-affairs\/wp-json\/wp\/v2\/media\/130254"}],"wp:attachment":[{"href":"https:\/\/vajiramandravi.com\/current-affairs\/wp-json\/wp\/v2\/media?parent=81736"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/vajiramandravi.com\/current-affairs\/wp-json\/wp\/v2\/categories?post=81736"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/vajiramandravi.com\/current-affairs\/wp-json\/wp\/v2\/tags?post=81736"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}