Ratle Hydroelectric Project

Ratle Hydroelectric Project is an 850 MW hydroelectric power project being built on the Chenab River in the Kishtwar District of Jammu & Kashmir.

Ratle Hydroelectric Project
Table of Contents☰

Ratle Hydroelectric Project Latest News

Continuous heavy rainfall across Jammu and Kashmir has led to a sharp rise in the water level of the Chenab River recently, damaging the temporary cofferdam at the under-construction 850 MW Ratle Hydroelectric Power Project.

About Ratle Hydroelectric Project

  • It is an 850 MW hydroelectric power project being built on the Chenab River in the Kishtwar District of Jammu & Kashmir.
  • It is a run-of-river project.  
  • It is located downstream of the Dulhasti project and upstream of the Baghlihar project. 
  • The project is implemented by the Ratle Hydroelectric Power Corporation (RHPCL).
    • RHPCL was formed as a joint venture (JV) between Jammu & Kashmir State Power Development Corporation (JKSPDC) and India’s state-owned National Hydroelectric Power Corporation (NHPC).
    • NHPC and JKSPDC hold 51% and 49% equity ownership in RHPCL, respectively.
  • The construction work is being undertaken by Megha Engineering and Infrastructure Limited (MEIL).
  • The project includes a 133-meter-tall and 194.8-meter-long concrete gravity dam, a diversion dam, and an underground powerhouse on the right bank of the river.
  • The underground powerhouse will house four 205 MW Francis turbine-generating units and a 30 MW auxiliary turbine-generating unit.
  • The project is expected to generate 3,137 GWh of electricity.
  • Pakistan has frequently alleged that the project violates the Indus Waters Treaty of 1960.

News: PT

Update Icon
Latest UPSC Exam 2026 Updates

Date IconLast updated on August, 2026

→ UPSC Mains 2026 will be conducted on 21st, 22nd, 23rd, 29th and 30th August 2026.

→ Check out the latest UPSC Syllabus 2026 here.

→ UPSC Mains Admit Card 2026 is expected to be released in early August at upsc.gov.in or upsconline.nic.in

→ Enroll in Vajiram & Ravi’s UPSC Mains Test Series 2027 for structured answer writing practice, expert evaluation, and exam-oriented feedback.

→ Join Vajiram & Ravi’s UPSC Mentorship Program 2027 for personalized guidance, strategy planning, and one-to-one support from experienced mentors.

→ Go through the UPSC Mains Previous Year Papers to enhance your preparation.

→ Download UPSC Mains Essay Paper 2025, UPSC Mains GS Paper-I 2025, UPSC Mains GS Paper-II 2025, UPSC Mains GS Paper-III 2025, UPSC Mains GS Paper-IV 2025, UPSC Mains English (Compulsory) Paper 2025, UPSC Mains Hindi (Qualifying) Paper 2025 here.

→ UPSC has released UPSC Toppers List 2025 with the Civil Services final result on its official website.

→ UPSC Calendar 2027 has been released.

→ Also check Best UPSC Coaching in India

Ratle Hydroelectric Project FAQs

Q1. What is the Ratle Hydroelectric Project?+

Q2. Where is the Ratle Hydroelectric Project located?+

Q3. What type of hydroelectric project is the Ratle Hydroelectric Project?+

Q4. Which corporation is implementing the Ratle Hydroelectric Project?+

Tags: prelims pointers ratle hydroelectric project upsc prelims current affairs

UPSC GS Course 2026
UPSC GS Course 2026
₹1,80,000
Enroll Now
GS Foundation Course 2 Yrs
GS Foundation Course 2 Yrs
₹2,45,000
Enroll Now
UPSC Mentorship Program
UPSC Mentorship Program
₹85000
Enroll Now
UPSC Sureshot Mains Test Series
UPSC Sureshot Mains Test Series
₹29500
Enroll Now
Prelims Powerup Test Series
Prelims Powerup Test Series
₹14000
Enroll Now
Enquire Now