Chandrayaan-3

Chandrayaan-3 is a follow-on mission to Chandrayaan-2 to demonstrate end-to-end capability in safe landing and roving on the lunar surface

Chandrayaan-3
Table of Contents

Chandrayaan-3 Latest News

New findings based on data from India’s Chandrayaan-3 mission suggest that water ice on the Moon may be present beyond its polar regions.

About Chandrayaan-3

  • Chandrayaan-3 is the Indian Space Research Organisation’s (ISRO) second attempt, after Chandrayaan-2, to achieve a successful landing and rover operation on the Moon’s surface.
  • Chandrayaan-3 was launched using ISRO’s LVM3 rocket, designed to place modules into the Geosynchronous Transfer Orbit (GTO) at a lower cost.
    • LVM3 is a three-stage rocket with two solid strap-on boosters and a core liquid stage.
    • The LVM3 M4 launcher positioned the integrated modules in an elliptical parking orbit of approximately 170 x 36,500 km.
  • Objectives: The mission aims to explore the presence of water ice, which could support future lunar habitation and provide fuel for interplanetary missions. Key goals include:
    • Achieving a safe and soft landing on the Moon.
    • Conducting rover-based exploration of the lunar surface.
    • Performing in-situ scientific experiments through the rover.
  • Mission Components: Chandrayaan-3 consists of a Lander Module (LM), a Propulsion Module (PM), and a Rover designed to develop and demonstrate interplanetary mission technologies.

Chandrayaan-3 Recent Findings

  • New data from Chandrayaan-3 indicates possible water-ice deposits beyond the Moon’s polar regions.
  • A study by the Physical Research Laboratory (PRL), Ahmedabad, using data from Chandra’s Surface Thermophysical Experiment (ChaSTE) instrument, supports this finding.
  • ChaSTE measured a 60°C temperature difference between the lunar surface and 10 cm below it, revealing that the Moon’s surface layer is highly non-conductive, providing insights into its composition and thermal properties.

Chandrayaan-3 FAQs

Q1. Is Chandrayaan-3 still working?

Ans. Chandrayaan-3’s lander and rover completed their mission after one lunar day; the propulsion module remains in Earth orbit.

Q2. When was Chandrayaan-3 landed?

Ans. Chandrayaan-3 successfully landed on the Moon’s South Pole on August 23, 2023.

Q3. Is Chandrayaan-3 a success or failure?

Ans. Chandrayaan-3 was a success, achieving a soft landing on the Moon’s South Pole and completing its scientific objectives.

Q4. What is the difference between Chandrayaan 2 and Chandrayaan-3?

Ans. Chandrayaan-3 lacks an orbiter, unlike Chandrayaan-2, and focuses on soft landing with improved lander and rover capabilities.

Source: FE

Update Icon
Latest UPSC Exam 2026 Updates

Date IconLast updated on June, 2026

UPSC Prelims Result 2026 is expected to be released between 7th June and 14th June 2026.

UPSC Prelims Provisional Answer Key 2026 out for GS Paper 1 and CSAT.

UPSC Prelims Question Paper 2026 Out, Download GS Paper 1 PDF conducted on 24th May 2026.

UPSC Mains 2026 will be conducted from 21st August 2026 onwards, and UPSC Prelims 2027 will be held on 23rd May 2027.

→ Prepare effectively with Vajiram & Ravi’s UPSC Prelims Test Series 2027 featuring full-length mock tests, detailed solutions, and performance analysis.

UPSC Final Result 2025 is now out.

→ UPSC has released UPSC Toppers List 2025 with the Civil Services final result on its official website.

Anuj Agnihotri secured AIR 1 in the UPSC Civil Services Examination 2025.

UPSC Notification 2026 & UPSC IFoS Notification 2026 is now out on the official website at upsconline.nic.in.

UPSC Calendar 2027 has been released.

→ Check out the latest UPSC Syllabus 2026 here.

→ The UPSC Selection Process is of 3 stages-Prelims, Mains and Interview.

→ Enroll in Vajiram & Ravi’s UPSC Mains Test Series 2026 for structured answer writing practice, expert evaluation, and exam-oriented feedback.

→ Join Vajiram & Ravi’s Best UPSC Mentorship Program for personalized guidance, strategy planning, and one-to-one support from experienced mentors.

Shakti Dubey secures AIR 1 in UPSC CSE Exam 2024.

→ Also check Best UPSC Coaching in India

Vajiram Content Team
Vajiram Content Team
UPSC GS Course 2026
UPSC GS Course 2026
₹1,80,000
Enroll Now
GS Foundation Course 2 Yrs
GS Foundation Course 2 Yrs
₹2,45,000
Enroll Now
UPSC Mentorship Program
UPSC Mentorship Program
₹85000
Enroll Now
UPSC Sureshot Mains Test Series
UPSC Sureshot Mains Test Series
₹19000
Enroll Now
Prelims Powerup Test Series
Prelims Powerup Test Series
₹8500
Enroll Now
Enquire Now