The Srisailam Project is a major multi-purpose river project built across the Krishna River in Andhra Pradesh, India. It plays an important role in providing hydroelectric power, supporting irrigation, and helping in water management for nearby regions. In a broader sense, it reflects how large dams are used for development, resource utilization, and regional growth. The project also highlights the balance between economic benefits and the need for sustainable use of natural resources.
Srisailam Project Location & Features
- The Srisailam Project is a major multi-purpose river valley project built across the Krishna River, located on the border of Telangana and Andhra Pradesh near Srisailam town.
- It is strategically situated between Kurnool district (Andhra Pradesh) and Nagarkurnool/Mahabubnagar region (Telangana), making it important for both states.
- Construction of the Srisailam Dam began in 1960, the main structure was completed on July 26, 1980, and it was officially inaugurated in 1981.
- The project lies in a deep gorge of the Nallamala Hills, at an elevation of around 300 meters above sea level, which provides a naturally suitable site for dam construction.
- This natural valley location helps in the formation of a large reservoir, enabling efficient water storage and hydropower generation.
- The Srisailam Project is recognized as a significant engineering landmark as well as a vital water resource project in southern India.
- It plays a crucial role in hydroelectric power generation, irrigation, and drinking water supply, supporting millions of people in both states.
- The project acts as a lifeline for Telangana and Andhra Pradesh, contributing to regional development and water management.
- It is also officially known as the Neelam Sanjeeva Reddy Srisailam Project, highlighting its national importance.
- Srisailam Project Hydroelectric Power Generation : The project hosts the second-largest hydroelectric power station in India in terms of installed capacity. Power generation is divided into two main powerhouses:
- Left Bank Power House (Telangana side)
- Right Bank Power House (Andhra Pradesh side)
- The project has an estimated live storage capacity of 178.74 TMC ft.
Srisailam Project Role in Irrigation and Water Supply
- The Srisailam reservoir acts as a key water source for several irrigation and drinking water projects.
- It supports major canal systems:
- Srisailam Right Bank Canal (SRBC): Provides irrigation to large agricultural areas in Kurnool, Nandyal, and Kadapa districts.
- Srisailam Left Bank Canal (SLBC): Supplies water through tunnels to regions like Nalgonda and also contributes to Hyderabad’s drinking water needs.
- It is also connected to important inter-basin transfer projects, such as:
- Pothireddypadu Head Regulator
- Handri-Neeva Lift Irrigation Scheme
- Telugu Ganga Project, which supplies drinking water to Chennai
Srisailam Project Significance
- The project supports agriculture, energy, and drinking water needs across multiple regions.
- It helps in flood control and water management in the Krishna River basin.
- Acts as a strong example of how large dams contribute to regional development and resource management.
- At the same time, it highlights the need for balanced and sustainable use of water resources.
Last updated on August, 2026
→ UPSC Mains 2026 will be conducted on 21st, 22nd, 23rd, 29th and 30th August 2026.
→ Check out the latest UPSC Syllabus 2026 here.
→ UPSC Mains Admit Card 2026 is expected to be released in early August at upsc.gov.in or upsconline.nic.in
→ Enroll in Vajiram & Ravi’s UPSC Mains Test Series 2027 for structured answer writing practice, expert evaluation, and exam-oriented feedback.
→ Join Vajiram & Ravi’s UPSC Mentorship Program 2027 for personalized guidance, strategy planning, and one-to-one support from experienced mentors.
→ Go through the UPSC Mains Previous Year Papers to enhance your preparation.
→ Download UPSC Mains Essay Paper 2025, UPSC Mains GS Paper-I 2025, UPSC Mains GS Paper-II 2025, UPSC Mains GS Paper-III 2025, UPSC Mains GS Paper-IV 2025, UPSC Mains English (Compulsory) Paper 2025, UPSC Mains Hindi (Qualifying) Paper 2025 here.
→ UPSC has released UPSC Toppers List 2025 with the Civil Services final result on its official website.
→ UPSC Calendar 2027 has been released.
→ Also check Best UPSC Coaching in India
Srisailam Project FAQs
Q1. What is the Srisailam Project?+
Q2. Where is the Srisailam Project located?+
Q3. Which river is the Srisailam Dam built on?+
Q4. Why is the Srisailam Project important?+
Q5. What makes the location of Srisailam Project unique?+
Q6. What is the other name of the Srisailam Project?+
Q7. What is the power generation capacity of Srisailam Project?+
Q8. When was the Srisailam Dam constructed?+
Tags: economy economy notes geography geography notes srisailam project