Chamera Dam, Location, Features, History, Ravi River

Chamera Dam in Himachal Pradesh is a major hydroelectric project on the Ravi River, forming scenic Chamera Lake and supporting power generation, tourism and water sports in Chamba.

Chamera Dam
Table of Contents

The Chamera Dam is a major hydroelectric dam located in Chamba district of Himachal Pradesh, near Dalhousie. Built across the Ravi River, the dam forms the scenic Chamera Lake and plays an important role in hydroelectric power generation in the region. The Chamera project has been developed in different stages, with Chamera-I, Chamera-II and Chamera-III together contributing significantly to the area’s electricity supply. 

Chamera Dam Location, History & Features

  • Chamera Dam is located near Dalhousie in Chamba district, Himachal Pradesh, India. It is constructed across the Ravi River and its reservoir is popularly known as Chamera Lake.
  • The dam was opened in 1994 and became an important part of the hydroelectric development of the Ravi River basin. The project was developed in multiple stages to increase electricity generation capacity.
  • The first stage, Chamera-I, was completed with an installed capacity of 540 MW, generated through three units of 180 MW each.
  • The second stage, Chamera-II, has a capacity of 300 MW, with three generating units of 100 MW each.
  • The third stage, Chamera-III, became operational from 2012 and has an installed capacity of 231 MW, generated through three units of 77 MW each.
  • The Chamera Dam and its surrounding lake have also developed into an important attraction for visitors travelling to the Chamba and Dalhousie region.
  • The Chamera Dam has a height of around 140 metres and extends for approximately 295 metres in length. It has a catchment area of about 472.5 square kilometres.
  • The water level of Chamera Lake varies between approximately 747 metres and 763 metres, depending on the conditions and inflow.
  • One distinctive feature of Chamera Lake is the reported absence of aquatic life, which has made the reservoir suitable for several recreational and water-based activities.

Chamera Dam Hydroelectric Power Project and Importance

  • The Chamera Hydroelectric Power Project is important for generating electricity from the water resources of the Ravi River. Its different stages have significantly increased the total power-generation capacity of the region.
  • Chamera-I generates 540 MW, while Chamera-II generates 300 MW. Chamera-III adds another 231 MW, making the three stages an important part of Himachal Pradesh’s hydroelectric power infrastructure.
  • The project makes productive use of the Ravi River’s water resources and contributes to the development of hydropower in Himachal Pradesh.
  • Apart from its role in electricity generation, Chamera Lake has become a popular recreational destination.
  • The government and tourism authorities have promoted activities such as boating, kayaking, sailing and other water sports around the lake, making the Chamera Dam and Lake significant from both an energy and tourism perspective.
Update Icon
Latest UPSC Exam 2026 Updates

Date IconLast updated on August, 2026

UPSC Mains 2026 commenced on 21st August 2026 and will continue through 30th August 2026, as per the official examination schedule.

UPSC Mains Question Paper 2026 is out now for Essay & GS Paper 1, 2, 3 & 4.

UPSC Mains GS Paper 1 2026 is out now.

UPSC Mains GS Paper 2 2026 is out now.

UPSC Mains GS Paper 3 2026 is out now.

UPSC Mains GS Paper 4 2026 is out now.

UPSC Mains Indian Language Paper & English Compulsory Paper are out now.

→ Check out the latest UPSC Syllabus 2026 here.

UPSC Mains Admit Card 2026 is now out.

→ Enroll in Vajiram & Ravi’s UPSC Mains Test Series 2027 for structured answer writing practice, expert evaluation, and exam-oriented feedback.

→ Join Vajiram & Ravi’s UPSC Mentorship Program 2027 for personalized guidance, strategy planning, and one-to-one support from experienced mentors.

→ Go through the UPSC Mains Previous Year Papers to enhance your preparation.

→ Download UPSC Mains Essay Paper 2025, UPSC Mains GS Paper-I 2025, UPSC Mains GS Paper-II 2025, UPSC Mains GS Paper-III 2025, UPSC Mains GS Paper-IV 2025, UPSC Mains English (Compulsory) Paper 2025, UPSC Mains Hindi (Qualifying) Paper 2025 here.

→ UPSC has released UPSC Toppers List 2025 with the Civil Services final result on its official website.

UPSC Calendar 2027 has been released.

→ Also check Best UPSC Coaching in India

Chamera Dam FAQs

Q1. Where is Chamera Dam located?+

Q2. Which river does Chamera Dam impound?+

Q3. When was Chamera Dam opened?+

Q4. What is the height of Chamera Dam?+

Q5. What is the reservoir of Chamera Dam called?+

Q6. What is the total power generation capacity of the Chamera project?+

Q7. How much electricity does Chamera-I generate?+

Q8. What is the capacity of Chamera-II and Chamera-III?+

Tags: chamera dam environment environment notes

Keya Roy
Keya Roy is a Content Writer with over 2+ years of experience in creating well-researched, engaging, and reader-friendly content, with a particular focus on UPSC and State PSC examinations. She specialises in breaking down complex concepts into clear, structured, and easy-to-understand content. Having qualified multiple competitive exams at different stages, she brings a strong academic background and a practical understanding of competitive examination requirements to her writing.
UPSC GS Course 2027
UPSC GS Course 2027
₹1,80,000
Enroll Now
GS Foundation Course 2 Yrs
GS Foundation Course 2 Yrs
₹2,45,000
Enroll Now
UPSC Mentorship Program
UPSC Mentorship Program
₹69000
Enroll Now
UPSC Sureshot Mains Test Series
UPSC Sureshot Mains Test Series
₹27000
Enroll Now
Prelims Powerup Test Series
Prelims Powerup Test Series
₹14000
Enroll Now
Enquire Now