Saidongar-1 Pumped Storage Project Latest News
Environmental activists and opposition parties recently came out against the “rampant” cutting of hundreds of trees for Torrent Power’s Saidongar-1 Pumped Storage Project in Raigad district of Maharashtra.
About Saidongar-1 Pumped Storage Project
- The Saidongar 1 (Karjat) Off-Stream Open Loop Pumped Storage project (PSP) is a major hydro-energy initiative located in Karjat taluka, Raigad district of Maharashtra.
- The project is adjacent to the Bhimashankar Wildlife Sanctuary of Pune district in the Sahyadri-Western Ghats ranges.
- With a capacity of 3,000 MW, it will be India’s largest PSP.
- The project will comprise two reservoirs.
- The upper reservoir will be constructed on the hilltop with a maximum dam height of 27 m to create the desired storage capacity, while the lower reservoir will have a maximum height of 59 m and shall be constructed across River Pej.
- It comprises 10 reversible pump turbines, each of 300 MW.
- It is being developed by Torrent Energy Storage Solutions Private Limited, a subsidiary of Gujarat-based Torrent Power Ltd.
- Once operational, it will reduce carbon dioxide emissions by 4.55 million tons per year, roughly equivalent to taking around 1 million cars off the road annually.
- With an annual energy production of 6,241 GWh, the project is expected to contribute to grid reliability and energy security in the state and other regions.
News: NIE
Last updated on Oct, 2026
→ UPSC 2027 Notification will be released on 13 January 2027 at upsconline.nic.in.
→ Check Nobel Prize 2026 Winners List here.
→ Download PIB PRiSM Monthly Magazine 2026 here.
→ Check UPSC Monthly Current Affairs Magazine The Recitals here.
→ Check out the latest UPSC Syllabus here.
→ Download UPSC Model Answers for Mains 2026
→ UPSC Mains Question Paper 2026 is out now for Essay & GS Paper 1, 2, 3 & 4.
→ UPSC Calendar 2027 has been released.
→ Enroll in Vajiram & Ravi’s UPSC Mains Test Series 2027 for structured answer writing practice, expert evaluation, and exam-oriented feedback.
→ Join Vajiram & Ravi’s UPSC Mentorship Program 2027 for personalized guidance, strategy planning, and one-to-one support from experienced mentors.
→ Go through the UPSC Mains Previous Year Papers to enhance your preparation.
→ UPSC has released UPSC Toppers List 2025 with the Civil Services final result on its official website.
→ Also check Best UPSC Coaching in India
Saidongar-1 Pumped Storage Project FAQs
Q1. Where is the Saidongar-1 Pumped Storage Project located?+
Q2. Which wildlife sanctuary is located adjacent to the Saidongar-1 project?+
Q3. What is the planned installed capacity of the Saidongar-1 project?+
Q4. What is the significance of the Saidongar-1 project in terms of capacity?+
Q5. Which company is developing the Saidongar-1 Pumped Storage Project?+
Tags: prelims pointers saidongar-1 pumped storage project upsc current affairs upsc prelims current affairs








