Scheme of budgetary support for the cost of Enabling Infrastructure for Hydro Electric Projects (HEP)

Scheme of budgetary support for the cost of Enabling Infrastructure for Hydro Electric Projects (HEP) set to run from FY 2024-25 to FY 2031-32, aims to enhance infrastructure and support the development of hydro power in India.

Table of Contents

About Scheme of budgetary support for the cost of Enabling Infrastructure for Hydro Electric Projects (HEP):

  • This scheme, set to run from FY 2024-25 to FY 2031-32, aims to enhance infrastructure and support the development of hydro power in India.
  • The scheme addresses major challenges such as remote locations and inadequate infrastructure by broadening its scope to cover additional costs.
    • This includes funding for the construction of transmission lines, upgrading pooling substations, and developing ropeways, railway sidings, and communication infrastructure.
    • It also supports the strengthening of existing roads and bridges leading to project sites.
  • The scheme is set to supporthydro power projects with a cumulative generation capacity of approximately 31,350 MW.
  • It applies to all hydro projects over 25 MW, including private sector projects, and Pumped Storage Projects (PSPs).
  • Budgetary support limits have been revised to Rs. 1 crore per MW for projects up to 200 MW, and Rs. 200 crores plusRs. 0.75 crore per MW for projects above 200 MW, with potential increases up to Rs. 1.5 crore per MW in exceptional cases.
  • The scheme also incorporates a rigorous approval process, where budgetary support will be granted following cost appraisals by the Department of Investment and Public Asset Management (DIB) and Public Investment Board (PIB), and subsequent approval by the Competent Authority.
  • The projects whose Letter of Award of the first major package is issued by June 30, 2028, will be eligible under the scheme. 

Q1: What is HydroElectric Power?

Hydroelectric power, electricity produced from generators driven by turbines that convert the potential energy of falling or fast-flowing water into mechanical energy.

Source: Cabinet approves Modification of the scheme of Budgetary Support for the cost of Enabling Infrastructure for Hydro Electric Project

Update Icon
Latest UPSC Exam 2026 Updates

Date IconLast updated on Sep, 2026

UPSC 2027 Notification will be released on 13 January 2027 at upsconline.nic.in.

→ Check out the latest UPSC Syllabus here.

→ Download UPSC Model Answers for Mains 2026

UPSC Mains Question Paper 2026 is out now for Essay & GS Paper 1, 2, 3 & 4.

UPSC Calendar 2027 has been released.

→ Enroll in Vajiram & Ravi’s UPSC Mains Test Series 2027 for structured answer writing practice, expert evaluation, and exam-oriented feedback.

→ Join Vajiram & Ravi’s UPSC Mentorship Program 2027 for personalized guidance, strategy planning, and one-to-one support from experienced mentors.

→ Go through the UPSC Mains Previous Year Papers to enhance your preparation.

→ UPSC has released UPSC Toppers List 2025 with the Civil Services final result on its official website.

→ Also check Best UPSC Coaching in India

Vajiram Content Team
At Vajiram & Ravi, our team includes subject experts who have appeared for the UPSC Mains and the Interview stage. With their deep understanding of the exam, they create content that is clear, to the point, reliable, and helpful for aspirants.Their aim is to make even difficult topics easy to understand and directly useful for your UPSC preparation—whether it’s for Current Affairs, General Studies, or Optional subjects. Every note, article, or test is designed to save your time and boost your performance.
UPSC GS Course 2027
UPSC GS Course 2027
₹1,80,000
Enroll Now
GS Foundation Course 2 Yrs
GS Foundation Course 2 Yrs
₹2,45,000
Enroll Now
UPSC Mentorship Program
UPSC Mentorship Program
₹65000
Enroll Now
UPSC Sureshot Mains Test Series
UPSC Sureshot Mains Test Series
₹27000
Enroll Now
Prelims Powerup Test Series
Prelims Powerup Test Series
₹14000
Enroll Now
Enquire Now