Dulhasti Stage-II Hydropower Project

Dulhasti Stage-II Hydropower Project is a 260-megawatt hydropower project proposed on the Chenab River in the Kishtwar District of Jammu and Kashmir. Read more about Dulhasti Stage-II Hydropower Project, Latest News

Dulhasti Stage-II Hydropower Project

Dulhasti Stage-II Hydropower Project Latest News

A panel under the Ministry of Environment, Forest and Climate Change recently approved the 260-megawatt Dulhasti Stage-II hydropower project on the Chenab river in Jammu and Kashmir’s Kishtwar district.

About Dulhasti Stage-II Hydropower Project

  • It is a 260-megawatt hydropower project proposed on the Chenab River in the Kishtwar District of Jammu and Kashmir. 
  • It is an extension of the existing 390 MW Dulhasti Stage-I Hydroelectric Project (Dulhasti Power Station), which has been successfully operating since its commissioning in 2007 by the National Hydroelectric Power Corporation Limited.
  • Under the plan, water will be diverted from the Stage-I power station through a separate tunnel measuring 3,685 metres in length and 8.5 metres in diameter to form a horseshoe-shaped pondage for Stage-II.
  • The project also includes a surge shaft, a pressure shaft, and an underground powerhouse housing two 130 MW units, resulting in a total installed capacity of 260 MW and an annual energy generation.
  • The project is estimated to cost more than Rs 3,200 crore.

Source: TI

Latest UPSC Exam 2025 Updates

Last updated on December, 2025

→ Check out the latest UPSC Syllabus 2026 here.

→ Join Vajiram & Ravi’s Interview Guidance Programme for expert help to crack your final UPSC stage.

UPSC Mains Result 2025 is now out.

UPSC Notification 2026 is scheduled to be released on January 14, 2026.

UPSC Calendar 2026 is released on 15th May, 2025.

UPSC Prelims 2026 will be conducted on 24th May, 2026 & UPSC Mains 2026 will be conducted on 21st August 2026.

→ The UPSC Selection Process is of 3 stages-Prelims, Mains and Interview.

UPSC Result 2024 is released with latest UPSC Marksheet 2024. Check Now!

UPSC Toppers List 2024 is released now. Shakti Dubey is UPSC AIR 1 2024 Topper.

→ Also check Best IAS Coaching in Delhi

Dulhasti Stage-II Hydropower Project FAQs

Q1. On which river is the Dulhasti Stage-II Hydropower Project proposed?+

Q2. What is the installed capacity of the Dulhasti Stage-II Hydropower Project?+

Q3. Dulhasti Stage-II is an extension of which existing hydropower project?+

Q4. When was the Dulhasti Stage-I Power Station commissioned?+

Tags: dulhasti stage-II hydropower project prelims pointers upsc current affairs upsc prelims current affairs

Vajiram Prelims Team
Vajiram Prelims Team
At Vajiram & Ravi, our team includes subject experts who have appeared for the UPSC Mains and the Interview stage. With their deep understanding of the exam, they create content that is clear, to the point, reliable, and helpful for aspirants.Their aim is to make even difficult topics easy to understand and directly useful for your UPSC preparation—whether it’s for Current Affairs, General Studies, or Optional subjects. Every note, article, or test is designed to save your time and boost your performance.
UPSC GS Course 2026
UPSC GS Course 2026
₹1,75,000
Enroll Now
GS Foundation Course 2 Yrs
GS Foundation Course 2 Yrs
₹2,45,000
Enroll Now
UPSC Mentorship Program
UPSC Mentorship Program
₹65000
Enroll Now
UPSC Sureshot Mains Test Series
UPSC Sureshot Mains Test Series
₹25000
Enroll Now
Prelims Powerup Test Series
Prelims Powerup Test Series
₹13000
Enroll Now
Enquire Now