Bhakra Dam Latest News
The Bhakra Beas Management Board (BBMB) recently commissioned an emergency study after detecting that the main wall of the Bhakra dam on the Sutlej river along the Punjab-Himachal Pradesh border is tilting outward beyond permissible limits.
About Bhakra Dam
- It is a concrete gravity dam across the Sutlej River.
- It is located at a gorge near the upstream Bhakra village in the Bilaspur district of Himachal Pradesh.
- It is near the border between Punjab and Himachal Pradesh.
- It is the highest straight gravity dam in the world, with a height of about 207.26 meters.
- It is Asia’s second tallest dam, next to the 261 m Tehri Dam, also in India.
- History:
- The Bhakra Dam is one of the earliest river valley development schemes undertaken by India after independence.
- The construction of this dam started in 1948, when Jawahar Lal Nehru, the first prime minister of India, poured the first bucket of concrete into the foundations of Bhakra.
- The dam was completed by the end of 1963.
- Bhakra Dam was described as the ‘New Temple of Resurgent India’ by Jawaharlal Nehru.
- Operation and maintenance of the Bhakra dam is done by the Bhakra Beas Management Board (BBMB).
- The dam created the massive Gobind Sagar reservoir and plays a crucial role in irrigation, flood control, and hydroelectric power generation for Punjab, Haryana, Rajasthan, Himachal Pradesh, and Chandigarh.
- The 90 km long reservoir is spread over an area of 168.35 sq.km.
- In terms of storage of water, it is the second largest reservoir in India, the first being Indira Sagar Dam in Madhya Pradesh with a capacity of 12.22 billion cu m.
- Nangal Dam is another dam downstream of Bhakra Dam. Sometimes both the dams together are called the Bhakra-Nangal Dam, though they are two separate dams.
- Nangal Dam is an earthen dam with a height of 29 meters and a length of 305 meters.
- It serves as an auxiliary dam to channel the water released from Bhakra Dam to two powerhouses.
- The installed capacity of Bhakra Right Bank Power House is 785 MW, and that of Bhakra Left Bank Power House is 630 MW.
Source: HT
Last updated on August, 2026
→ UPSC Mains 2026 will be conducted on 21st, 22nd, 23rd, 29th and 30th August 2026.
→ Check out the latest UPSC Syllabus 2026 here.
→ UPSC Mains Admit Card 2026 is expected to be released in early August at upsc.gov.in or upsconline.nic.in
→ Enroll in Vajiram & Ravi’s UPSC Mains Test Series 2026 for structured answer writing practice, expert evaluation, and exam-oriented feedback.
→ Go through the UPSC Mains Previous Year Papers to enhance your preparation.
→ Download UPSC Mains Essay Paper 2025, UPSC Mains GS Paper-I 2025, UPSC Mains GS Paper-II 2025, UPSC Mains GS Paper-III 2025, UPSC Mains GS Paper-IV 2025, UPSC Mains English (Compulsory) Paper 2025, UPSC Mains Hindi (Qualifying) Paper 2025 here.
→ UPSC has released UPSC Toppers List 2025 with the Civil Services final result on its official website.
→ UPSC Calendar 2027 has been released.
→ Also check Best UPSC Coaching in India
Bhakra Dam FAQs
Q1. Where is the Bhakra Dam located?+
Q2. Across which river is the Bhakra Dam constructed?+
Q3. What type of dam is the Bhakra Dam?+
Q4. Which dam is Asia’s second tallest dam?+
Tags: bhakra dam prelims pointers upsc current affairs upsc prelims current affairs







