About Chhukha Hydroelectric Project:
- It is a run-of-the-river reservoir-based project.
- Location: It is located in the Wangchu River/basin in Chukha, Bhutan.
- Installed capacity: 336 MW.
- It was built by the Government of India (GoI) at the cost of Rs. 246 crores.
- The GoI fully funded this project with a 60 per cent grant and a 40 per cent loan.
- The project construction commenced in 1979 and subsequently entered into commercial operation in 1986.
- Power Purchase Agreement: The power generated from the project is sold to the Eastern Regional Power Grid of India under a power purchase agreement.
Q1) Which are the major river systems in Bhutan?
There are four major river systems in Bhutan namely Torsa, Wangchu (known as Raidak in India), Sankosh and Manas. All these rivers having large snow fed perennial flows, afford attractive possibilities of hydro-electric development.
Source: India to step up support for Bhutan’s five-year plan, work for expediting rail link project
Last updated on Sep, 2026
→ UPSC 2027 Notification will be released on 13 January 2027 at upsconline.nic.in.
→ Check out the latest UPSC Syllabus here.
→ Download UPSC Model Answers for Mains 2026
→ UPSC Mains Question Paper 2026 is out now for Essay & GS Paper 1, 2, 3 & 4.
→ UPSC Calendar 2027 has been released.
→ Enroll in Vajiram & Ravi’s UPSC Mains Test Series 2027 for structured answer writing practice, expert evaluation, and exam-oriented feedback.
→ Join Vajiram & Ravi’s UPSC Mentorship Program 2027 for personalized guidance, strategy planning, and one-to-one support from experienced mentors.
→ Go through the UPSC Mains Previous Year Papers to enhance your preparation.
→ UPSC has released UPSC Toppers List 2025 with the Civil Services final result on its official website.
→ Also check Best UPSC Coaching in India