Kadamparai Pumped Storage Hydro Power Plant Latest News
Kadamparai Pumped Storage Hydro Power Plant, Tamil Nadu’s only facility with reversible two-way turbines, is struggling to stay operational as it is beyond its design life, functioning at just 25% capacity.
About Kadamparai Pumped Storage Hydro Power Plant
- It is a 400 MW hydropower project located in the Kadamparai river basin in Tamil Nadu.
- Commissioned in 1987, it was the state’s first pumped storage unit and remains unique for its ability to operate in both generator and motor modes.
- When the grid needs power, water is released from the upper dam at Kadamparai to the Lower Aliyar Dam, driving the turbines to generate electricity.
- During the night, with wind and solar creating surplus power in the grid, the same turbines reverse into pump mode and act as motors and push water back from the lower dam to the upper dam, effectively storing energy for the next demand cycle.
- The Kadamparai Dam has a storage capacity of 1,080 mcft, while the Lower Aliyar Dam holds 937 mcft.
- Using a minimum of 4 mcft from the upper dam, each unit can produce 100 MW (1 lakh units) per hour.
- With four units, the plant’s installed capacity is 400 MW per hour.
Source: NIE
Last updated on July, 2026
→ UPSC Prelims Result 2026 is now out.
→ UPSC IFoS Prelims Result 2026 is now out.
→ Enroll in Vajiram & Ravi’s UPSC Mains Test Series 2026 for structured answer writing practice, expert evaluation, and exam-oriented feedback.
→ Join Vajiram & Ravi’s UPSC Mentorship Program 2026 for personalized guidance, strategy planning, and one-to-one support from experienced mentors.
→ Join Vajiram & Ravi’s UPSC Mentorship Program 2027 for personalized guidance, strategy planning, and one-to-one support from experienced mentors.
→ UPSC Prelims Provisional Answer Key 2026 out for GS Paper 1 and CSAT.
→ UPSC Prelims Question Paper 2026 Out, Download GS Paper 1 PDF conducted on 24th May 2026.
→ UPSC Mains 2026 will be conducted from 21st August 2026 onwards, and UPSC Prelims 2027 will be held on 23rd May 2027.
→ UPSC Final Result 2025 is now out.
→ UPSC has released UPSC Toppers List 2025 with the Civil Services final result on its official website.
→ Anuj Agnihotri secured AIR 1 in the UPSC Civil Services Examination 2025.
→ UPSC Notification 2026 & UPSC IFoS Notification 2026 is now out on the official website at upsconline.nic.in.
→ UPSC Calendar 2027 has been released.
→ Check out the latest UPSC Syllabus 2026 here.
→ The UPSC Selection Process is of 3 stages-Prelims, Mains and Interview.
→ Shakti Dubey secures AIR 1 in UPSC CSE Exam 2024.
→ Also check Best UPSC Coaching in India
Kadamparai Pumped Storage Hydro Power Plant FAQs
Q1. Where is the Kadamparai Pumped Storage Hydro Power Plant located?+
Q2. When was the Kadamparai Pumped Storage Hydro Power Plant commissioned?+
Q3. How does the Kadamparai Pumped Storage Hydro Power Plant generate electricity during periods of high power demand?+
Q4. What is the total power generation capacity of Kadamparai Pumped Storage Hydro Power Plant?+