Polavaram Project Latest News
The Prime Minister will chair a meeting with chief ministers of Andhra Pradesh, Telangana, Odisha, and Chhattisgarh to discuss the Polavaram project.
About Polavaram Project
- It is a multi-purpose irrigation project built on the Godavari River where the river emerges out of the last range of the Eastern Ghats and enters the plains.
- The dam will be located near Polavaram village in the West Godavari district of Andhra Pradesh, an area bordering Chhattisgarh and Odisha.Â
- It was conceived in 1980 as a part of the recommendations of the Godavari Water Disputes Tribunal (GWDT).
- It has been accorded national project status by the central government.
- It involves the construction of a dam to address water scarcity, boost agricultural productivity, and generate power.
- The span of the dam is about 1.2 km, having a pier height of 54 m and a total of 48 radial gates (16mx20m).
- Designed to withstand massive floods that could occur once in 1000 years, the Polavaram Spillway is set to have the highest discharge capacity in the world.
- At 50 lakh cusecs, it is set to surpass even the 3 Gorges Dam of China, one of the largest dams in the world.
- The project has set a world record by pouring 32,315.5 cubic metres of concrete into the spillway channel of the project.
Polavaram Project Objectives
- It is intended for the development of a gross irrigation potential of 4,36,825 ha.Â
- The project also envisages the generation of 960 MW of hydropower and drinking water supply to a population of 28.50 lakh in 611 villages.
- The project also aims to transfer 80 TMC (Thousand Million Cubic Feet) of water from the Godavari to the Krishna river basin.
- The dam will help manage floodwaters from the Godavari River, reducing risks to nearby communities.
Polavaram Project FAQs
Q1:Â On which river is the Polavaram Project constructed?
Ans:Â Godavari River
Q2:Â Where is the Polavaram Project located?
Ans:Â It is located in the West Godavari district of Andhra Pradesh, an area bordering Chhattisgarh and Odisha.Â
Q3:Â How much hydropower is the Polavaram Project expected to generate?
Ans:Â 960 MW
Source:Â TOI
Last updated on August, 2026
→ UPSC Mains 2026 will be conducted on 21st, 22nd, 23rd, 29th and 30th August 2026.
→ Check out the latest UPSC Syllabus 2026 here.
→ UPSC Mains Admit Card 2026 is expected to be released soon at upsc.gov.in or upsconline.nic.in
→ Enroll in Vajiram & Ravi’s UPSC Mains Test Series 2027 for structured answer writing practice, expert evaluation, and exam-oriented feedback.
→ Join Vajiram & Ravi’s UPSC Mentorship Program 2027 for personalized guidance, strategy planning, and one-to-one support from experienced mentors.
→ Go through the UPSC Mains Previous Year Papers to enhance your preparation.
→ Download UPSC Mains Essay Paper 2025, UPSC Mains GS Paper-I 2025, UPSC Mains GS Paper-II 2025, UPSC Mains GS Paper-III 2025, UPSC Mains GS Paper-IV 2025, UPSC Mains English (Compulsory) Paper 2025, UPSC Mains Hindi (Qualifying) Paper 2025 here.
→ UPSC has released UPSC Toppers List 2025 with the Civil Services final result on its official website.
→ UPSC Calendar 2027 has been released.
→ Also check Best UPSC Coaching in India
Tags: polavaram project prelims pointers upsc current affairs upsc prelims current afffairs







