Sewa-II Hydroelectric Project

Sewa-II Hydroelectric Project is a 120 MW run-of-the-river hydro power project located in the Kathua district of Jammu and Kashmir. Read more about Sewa-II Hydroelectric Project, Latest News

Sewa-II Hydroelectric Project
Table of Contents☰

Sewa-II Hydroelectric Project Latest News

Four CISF personnel, posted at the Sewa-II Hydroelectric Project unit in J&K’s Kathua district, were allegedly shot dead by a colleague in an apparent case of fratricidal violence recently.

About Sewa-II Hydroelectric Project

  • It is a 120 MW run-of-the-river hydro power project located in the Kathua district of Jammu and Kashmir.
  • It is located on the Sewa River, a tributary of the Ravi River.  
  • It is a concrete gravity-type dam. The height and length of the dam are 53 m and 114 m, respectively. 
  • The Headrace tunnel is horseshoe-shaped with a diameter of 3.3 m and a length of 10.084 km.  
  • The surface powerhouse, with an installed capacity of 120 MW, houses three units of 40 MW capacity each.
  • The project construction commenced in 2003 and subsequently entered into commercial operation in 2010. 
  • It is being operated and maintained by National Hydroelectric Power Corporation Limited (NHPC).

News: TH

Update Icon
Latest UPSC Exam 2026 Updates

Date IconLast updated on Sep, 2026

→ UPSC 2027 Notification will be released on 13 January 2027 at upsconline.nic.in.

→ Asian Games 2026 are being held in Aichi-Nagoya, Japan, from 19 September to 4 October.

→ Check out the latest UPSC Syllabus here.

→ Download UPSC Model Answers for Mains 2026

→ UPSC Mains Question Paper 2026 is out now for Essay & GS Paper 1, 2, 3 & 4.

→ UPSC Calendar 2027 has been released.

→ Enroll in Vajiram & Ravi’s UPSC Mains Test Series 2027 for structured answer writing practice, expert evaluation, and exam-oriented feedback.

→ Join Vajiram & Ravi’s UPSC Mentorship Program 2027 for personalized guidance, strategy planning, and one-to-one support from experienced mentors.

→ Go through the UPSC Mains Previous Year Papers to enhance your preparation.

→ UPSC has released UPSC Toppers List 2025 with the Civil Services final result on its official website.

→ Also check Best UPSC Coaching in India

Sewa-II Hydroelectric Project FAQs

Q1. What is the installed capacity of the Sewa-II Hydroelectric Project?+

Q2. Where is the Sewa-II Hydroelectric Project located?+

Q3. On which river is the Sewa-II Hydroelectric Project located?+

Q4. Which organisation operates and maintains the Sewa-II Hydroelectric Project?+

Tags: prelims pointers sewa-II hydroelectric project upsc current affairs upsc prelims current affairs

Vajiram Prelims Team
At Vajiram & Ravi, our team includes subject experts who have appeared for the UPSC Mains and the Interview stage. With their deep understanding of the exam, they create content that is clear, to the point, reliable, and helpful for aspirants.Their aim is to make even difficult topics easy to understand and directly useful for your UPSC preparation—whether it’s for Current Affairs, General Studies, or Optional subjects. Every note, article, or test is designed to save your time and boost your performance.
UPSC GS Course 2027
UPSC GS Course 2027
₹1,80,000
Enroll Now
GS Foundation Course 2 Yrs
GS Foundation Course 2 Yrs
₹2,45,000
Enroll Now
UPSC Mentorship Program
UPSC Mentorship Program
₹65000
Enroll Now
UPSC Sureshot Mains Test Series
UPSC Sureshot Mains Test Series
₹27000
Enroll Now
Prelims Powerup Test Series
Prelims Powerup Test Series
₹14000
Enroll Now
Enquire Now