Lower Subansiri Hydroelectric Project

Lower Subansiri Hydroelectric Project is a 2000 MW run-of-the-river hydro project being constructed on the Subansiri River, a tributary of the Brahmaputra.

Lower Subansiri Hydroelectric Project
Table of Contents

Lower Subansiri Hydroelectric Project Latest News

India’s largest hydroelectric project, the 2000-MW Subansiri Lower Hydroelectric Project, has begun its commissioning phase.

About Lower Subansiri Hydroelectric Project

  • It is a 2000 MW run-of-the-river hydro project being constructed on the Subansiri River, a tributary of the Brahmaputra.
  • It is located at Gerukamukh on the Arunachal Pradesh–Assam border.
  • It will be the single largest hydroelectric plant in India when completed.
  • The project is being developed by the state-run National Hydro Power Corporation (NHPC).
  • The construction of the project has been underway since 2005.
  • The project cost was met through 70% equity and 30% debt financing by the provision of a term loan. The central government is providing budgetary support as part of the equity component.

Lower Subansiri Hydroelectric Project Features

  • It consists of a concrete gravity dam, which will be 116 m high from the riverbed level and 130 m from the foundation. 
  • The length of the dam will be 284 m. The gross storage capacity of the reservoir will be 1.37 km3.
  • The powerhouse will comprise eight Francis-type turbines capable of generating 250 MW of electricity each. 
  • It will also have eight horseshoe-shaped headrace tunnels, eight horseshoe-shaped surge tunnels , and eight circular penstocks.
  • A tailrace channel (35 m long and 206 mwide) will take the water discharged by the turbines back to the river.

Source: TOI

Update Icon
Latest UPSC Exam 2026 Updates

Date IconLast updated on June, 2026

UPSC Prelims Result 2026 is now out.

UPSC IFoS Prelims Result 2026 is now out.

→ Enroll in Vajiram & Ravi’s UPSC Mains Test Series 2026 for structured answer writing practice, expert evaluation, and exam-oriented feedback.

→ Join Vajiram & Ravi’s UPSC Mentorship Program 2026 for personalized guidance, strategy planning, and one-to-one support from experienced mentors.

→ Join Vajiram & Ravi’s UPSC Mentorship Program 2027 for personalized guidance, strategy planning, and one-to-one support from experienced mentors.

UPSC Prelims Provisional Answer Key 2026 out for GS Paper 1 and CSAT.

UPSC Prelims Question Paper 2026 Out, Download GS Paper 1 PDF conducted on 24th May 2026.

UPSC Mains 2026 will be conducted from 21st August 2026 onwards, and UPSC Prelims 2027 will be held on 23rd May 2027.

UPSC Final Result 2025 is now out.

→ UPSC has released UPSC Toppers List 2025 with the Civil Services final result on its official website.

Anuj Agnihotri secured AIR 1 in the UPSC Civil Services Examination 2025.

UPSC Notification 2026 & UPSC IFoS Notification 2026 is now out on the official website at upsconline.nic.in.

UPSC Calendar 2027 has been released.

→ Check out the latest UPSC Syllabus 2026 here.

→ The UPSC Selection Process is of 3 stages-Prelims, Mains and Interview.

Shakti Dubey secures AIR 1 in UPSC CSE Exam 2024.

→ Also check Best UPSC Coaching in India

Lower Subansiri Hydroelectric Project FAQs

Q1. The Lower Subansiri Hydroelectric Project is being constructed on which river?+

Q2. The Lower Subansiri Hydroelectric Project is located on the border between which two states?+

Q3. What is the total installed capacity of the Lower Subansiri Hydroelectric Project?+

Q4. What type of hydroelectric project is the Lower Subansiri?+

Tags: lower subansiri hydroelectric project

Vajiram Content Team
Vajiram Content Team
UPSC GS Course 2026
UPSC GS Course 2026
₹1,80,000
Enroll Now
GS Foundation Course 2 Yrs
GS Foundation Course 2 Yrs
₹2,45,000
Enroll Now
UPSC Mentorship Program
UPSC Mentorship Program
₹85000
Enroll Now
UPSC Sureshot Mains Test Series
UPSC Sureshot Mains Test Series
₹19000
Enroll Now
Prelims Powerup Test Series
Prelims Powerup Test Series
₹14000
Enroll Now
Enquire Now