Grand Ethiopian Renaissance Dam (GERD)

The GERD, formerly known as the Millennium Dam, is situated in the Benishangul-Gumuz region of Ethiopia, near the border with Sudan. Read more about Grand Ethiopian Renaissance Dam (GERD), Location, Capacity, Dispute, Latest News

Grand Ethiopian Renaissance Dam

Grand Ethiopian Renaissance Dam Latest News

Ethiopia’s Prime Minister recently said the multi-billion-dollar Grand Ethiopian Renaissance Dam (GERD) on the Blue Nile that has long worried neighbouring countries is complete and will be officially inaugurated in September.

About Grand Ethiopian Renaissance Dam

  • The GERD, formerly known as the Millennium Dam, is situated in the Benishangul-Gumuz region of Ethiopia, near the border with Sudan.
  • It is located on the Blue Nile, one of the main tributaries of the Nile River.
  • Capacity: At 6.45 Gigawatts, it is the largest hydroelectric power plant in Africa.
  • Construction Started: April 2011
  • The project is owned by Ethiopian Electric Power Corporation (EEPCO).
  • Dispute: Egypt and Sudan fear the massive $4.2bn GERD will severely reduce the share of Nile water they receive and have repeatedly asked Ethiopia to stop filling it until they have all reached agreement on how it should work.

Grand Ethiopian Renaissance Dam Features

  • It is a roller-compacted concrete (RCC) gravity-type dam comprising two power stations, three spillways, and a saddle dam.
  • The main dam is 145 m high and 1,780 m long.
  • The dam forms a reservoir covering 1,875 sq.km, which can hold up to 74 billion cubic metres of water. The GERD reservoir is in a deep gorge, so its surface area is relatively small compared to its volume.
  • The saddle dam supporting the main dam is 4,800 m long and 45 m high. It has an emergency side spillway to discharge water directly into the reservoir.
  • The powerhouses include 16 generating units of 375 MW each.

Source: NDTV

Latest UPSC Exam 2025 Updates

Last updated on November, 2025

→ Check out the latest UPSC Syllabus 2026 here.

→ Join Vajiram & Ravi’s Interview Guidance Programme for expert help to crack your final UPSC stage.

→ UPSC Mains Result 2025 is now out.

→ UPSC Notification 2026 is scheduled to be released on January 14, 2026.

→ UPSC Calendar 2026 is released on 15th May, 2025.

→ The UPSC Vacancy 2025 were released 1129, out of which 979 were for UPSC CSE and remaining 150 are for UPSC IFoS.

→ UPSC Prelims 2026 will be conducted on 24th May, 2026 & UPSC Mains 2026 will be conducted on 21st August 2026.

→ The UPSC Selection Process is of 3 stages-Prelims, Mains and Interview.

→ UPSC Result 2024 is released with latest UPSC Marksheet 2024. Check Now!

→ UPSC Prelims Result 2025 is out now for the CSE held on 25 May 2025.

→ UPSC Toppers List 2024 is released now. Shakti Dubey is UPSC AIR 1 2024 Topper.

→ UPSC Prelims Question Paper 2025 and Unofficial Prelims Answer Key 2025  are available now.

→ UPSC Mains Question Paper 2025 is out for Essay, GS 1, 2, 3 & GS 4.

→ UPSC Mains Indian Language Question Paper 2025 is now out.

→ UPSC Mains Optional Question Paper 2025 is now out.

→ Also check Best IAS Coaching in Delhi

Grand Ethiopian Renaissance Dam FAQs

Q1. On which river is the Grand Ethiopian Renaissance Dam?+

Q2. Where is the Grand Ethiopian Renaissance Dam located?+

Q3. What is the installed power generation capacity of the Grand Ethiopian Renaissance Dam?+

Q4. What is the type of the GERD's main dam?+

Tags: grand ethiopian renaissance dam prelims pointers upsc current affairs upsc prelims current affairs

Vajiram Content Team
Vajiram Content Team
UPSC GS Course 2026
UPSC GS Course 2026
₹1,75,000
Enroll Now
GS Foundation Course 2 Yrs
GS Foundation Course 2 Yrs
₹2,45,000
Enroll Now
UPSC Mentorship Program
UPSC Mentorship Program
₹65000
Enroll Now
UPSC Sureshot Mains Test Series
UPSC Sureshot Mains Test Series
₹25000
Enroll Now
Prelims Powerup Test Series
Prelims Powerup Test Series
₹13000
Enroll Now
Enquire Now