Wangchu Hydroelectric Project

Wangchhu Hydro Electricity Project is a 570 MW run-of-river hydropower project being built on the Wangchu River/basin in Chukha District, Bhutan. Read more about Wangchu Hydroelectric Project, Location, River, Capacity, Latest News.

Wangchhu Hydroelectric Project
Table of Contents

Wangchhu Hydroelectric Project Latest News

The Adani Group recently commenced the 570 MW Wangchhu Hydro Electricity Project in Bhutan.

About Wangchhu Hydro Electricity Project

  • It is a 570 MW run-of-river hydropower project being built on the Wangchu River/basin in Chukha District, Bhutan. 
    • The Wangchu River (also called Raidāk River in India) is a significant tributary of the Brahmaputra River.
  • It is being developed by Wangchhu Hydroelectric Power Limited (WHPL), a joint venture company formed by India’s Adani Power Limited (APL) and Bhutan’s state-owned Druk Green Power Corporation Ltd (DGPC) following a shareholders’ agreement signed in September 2025.
    • DGPC holds a controlling 51% stake in the venture, with Adani Power owning the remaining 49%. 
  • This project will involve an investment of ₹6,000 crore.  It will be implemented on a build, own, operate, and transfer (BOOT) basis.
  • The facility will function as a peaking run-of-river plant, helping Bhutan manage seasonal fluctuations in hydropower generation.
  • The facility will feature four turbines, each rated at 142.5 MW, producing roughly 2,478.93 GWh annually.
  • The Wangchu Project will meet Bhutan’s electricity demand during winters. Power generated in the summer season will be exported to India.

Source: TOI

Update Icon
Latest UPSC Exam 2026 Updates

Date IconLast updated on August, 2026

UPSC Mains 2026 will be conducted on 21st, 22nd, 23rd, 29th and 30th August 2026.

→ Check out the latest UPSC Syllabus 2026 here.

UPSC Mains Admit Card 2026 is expected to be released in early August at upsc.gov.in or upsconline.nic.in

→ Enroll in Vajiram & Ravi’s UPSC Mains Test Series 2027 for structured answer writing practice, expert evaluation, and exam-oriented feedback.

→ Join Vajiram & Ravi’s UPSC Mentorship Program 2027 for personalized guidance, strategy planning, and one-to-one support from experienced mentors.

→ Go through the UPSC Mains Previous Year Papers to enhance your preparation.

→ Download UPSC Mains Essay Paper 2025, UPSC Mains GS Paper-I 2025, UPSC Mains GS Paper-II 2025, UPSC Mains GS Paper-III 2025, UPSC Mains GS Paper-IV 2025, UPSC Mains English (Compulsory) Paper 2025, UPSC Mains Hindi (Qualifying) Paper 2025 here.

→ UPSC has released UPSC Toppers List 2025 with the Civil Services final result on its official website.

UPSC Calendar 2027 has been released.

→ Also check Best UPSC Coaching in India

Wangchhu Hydro Electricity Project FAQs

Q1. What is the capacity of the Wangchhu Hydro Electricity Project?+

Q2. Where is the Wangchhu project located?+

Q3. The Wangchu River is a tributary of which major river?+

Tags: prelims pointers upsc current affairs upsc prelims current affairs wangchu hydroelectric project

Vajiram Prelims Team
At Vajiram & Ravi, our team includes subject experts who have appeared for the UPSC Mains and the Interview stage. With their deep understanding of the exam, they create content that is clear, to the point, reliable, and helpful for aspirants.Their aim is to make even difficult topics easy to understand and directly useful for your UPSC preparation—whether it’s for Current Affairs, General Studies, or Optional subjects. Every note, article, or test is designed to save your time and boost your performance.
UPSC GS Course 2026
UPSC GS Course 2026
₹1,80,000
Enroll Now
GS Foundation Course 2 Yrs
GS Foundation Course 2 Yrs
₹2,45,000
Enroll Now
UPSC Mentorship Program
UPSC Mentorship Program
₹85000
Enroll Now
UPSC Sureshot Mains Test Series
UPSC Sureshot Mains Test Series
₹27000
Enroll Now
Prelims Powerup Test Series
Prelims Powerup Test Series
₹14000
Enroll Now
Enquire Now