Wangchhu Hydroelectric Project Latest News
The Adani Group recently commenced the 570 MW Wangchhu Hydro Electricity Project in Bhutan.
About Wangchhu Hydro Electricity Project
- It is a 570 MW run-of-river hydropower project being built on the Wangchu River/basin in Chukha District, Bhutan.
- The Wangchu River (also called Raidāk River in India) is a significant tributary of the Brahmaputra River.
- It is being developed by Wangchhu Hydroelectric Power Limited (WHPL), a joint venture company formed by India’s Adani Power Limited (APL) and Bhutan’s state-owned Druk Green Power Corporation Ltd (DGPC) following a shareholders’ agreement signed in September 2025.
- DGPC holds a controlling 51% stake in the venture, with Adani Power owning the remaining 49%.
- This project will involve an investment of ₹6,000 crore. It will be implemented on a build, own, operate, and transfer (BOOT) basis.
- The facility will function as a peaking run-of-river plant, helping Bhutan manage seasonal fluctuations in hydropower generation.
- The facility will feature four turbines, each rated at 142.5 MW, producing roughly 2,478.93 GWh annually.
- The Wangchu Project will meet Bhutan’s electricity demand during winters. Power generated in the summer season will be exported to India.
Source: TOI
Last updated on August, 2026
→ UPSC Mains 2026 will be conducted on 21st, 22nd, 23rd, 29th and 30th August 2026.
→ Check out the latest UPSC Syllabus 2026 here.
→ UPSC Mains Admit Card 2026 is expected to be released in early August at upsc.gov.in or upsconline.nic.in
→ Enroll in Vajiram & Ravi’s UPSC Mains Test Series 2027 for structured answer writing practice, expert evaluation, and exam-oriented feedback.
→ Join Vajiram & Ravi’s UPSC Mentorship Program 2027 for personalized guidance, strategy planning, and one-to-one support from experienced mentors.
→ Go through the UPSC Mains Previous Year Papers to enhance your preparation.
→ Download UPSC Mains Essay Paper 2025, UPSC Mains GS Paper-I 2025, UPSC Mains GS Paper-II 2025, UPSC Mains GS Paper-III 2025, UPSC Mains GS Paper-IV 2025, UPSC Mains English (Compulsory) Paper 2025, UPSC Mains Hindi (Qualifying) Paper 2025 here.
→ UPSC has released UPSC Toppers List 2025 with the Civil Services final result on its official website.
→ UPSC Calendar 2027 has been released.
→ Also check Best UPSC Coaching in India
Wangchhu Hydro Electricity Project FAQs
Q1. What is the capacity of the Wangchhu Hydro Electricity Project?+
Q2. Where is the Wangchhu project located?+
Q3. The Wangchu River is a tributary of which major river?+
Tags: prelims pointers upsc current affairs upsc prelims current affairs wangchu hydroelectric project







