Arun-3 Hydroelectric Project

Arun-3 Hydroelectric Project is a 900 MW run-of-the-river hydropower project being developed on the Arun River in the Sankhuwasabha District of Eastern Nepal. Read more about Arun-III Hydro Power Project, Location, Capacity, Latest News.

Arun-3 Hydropower Project
Table of Contents

Arun-3 Hydroelectric Project Latest News

The Power Secretary recently reviewed the progress of SJVN’s 900 MW Arun-3 Hydroelectric Project in Nepal.

About Arun-3 Hydroelectric Project

  • It is a 900 MW run-of-the-river hydropower project being developed on the Arun River in the Sankhuwasabha District of Eastern Nepal. 
    • Arun is a tributary of the Koshi River in Nepal.
  • It envisages a concrete gravity dam about 70m high and a Head Race Tunnel (HRT) of 11.74 km with an underground power house containing four generating units of 225 MW each on the left bank.
  • Estimated to cost more than $1.6 bn, the hydropower plant will produce 4,018.87 million units of electricity a year.
  • Once completed, it will be the biggest hydroelectric facility in Nepal.
  • It is being developed on a build-own-operate and transfer (BOOT) basis by Satluj Jal Vidyut Nigam (SJVN) Arun 3 Power Development Company (SAPDC), a joint venture of the Government of India and the Government of Himachal Pradesh. 
  • SAPDC will operate the facility for a period of 25 years, excluding the construction period of five years, before transferring ownership to the Nepal government.
  • Nepal will receive 21.9% of the electricity generated at the power plant as free power during these initial 25 years of commercial operations.
  • The project will provide surplus power to India, strengthening economic linkages with Nepal. 
  • The power from the project shall be exported from Dhalkebar in Nepal to Muzaffarpur in India.

News: PSU

Update Icon
Latest UPSC Exam 2026 Updates

Date IconLast updated on August, 2026

UPSC Mains 2026 commenced on 21st August 2026 and will continue through 30th August 2026, as per the official examination schedule.

UPSC Mains Question Paper 2026 is out now for Essay & GS Paper 1, 2, 3 & 4.

UPSC Mains GS Paper 1 2026 is out now.

UPSC Mains GS Paper 2 2026 is out now.

UPSC Mains GS Paper 3 2026 is out now.

UPSC Mains GS Paper 4 2026 is out now.

→ Check out the latest UPSC Syllabus 2026 here.

UPSC Mains Admit Card 2026 is now out.

→ Enroll in Vajiram & Ravi’s UPSC Mains Test Series 2027 for structured answer writing practice, expert evaluation, and exam-oriented feedback.

→ Join Vajiram & Ravi’s UPSC Mentorship Program 2027 for personalized guidance, strategy planning, and one-to-one support from experienced mentors.

→ Go through the UPSC Mains Previous Year Papers to enhance your preparation.

→ Download UPSC Mains Essay Paper 2025, UPSC Mains GS Paper-I 2025, UPSC Mains GS Paper-II 2025, UPSC Mains GS Paper-III 2025, UPSC Mains GS Paper-IV 2025, UPSC Mains English (Compulsory) Paper 2025, UPSC Mains Hindi (Qualifying) Paper 2025 here.

→ UPSC has released UPSC Toppers List 2025 with the Civil Services final result on its official website.

UPSC Calendar 2027 has been released.

→ Also check Best UPSC Coaching in India

Arun-3 Hydroelectric Project FAQs

Q1. Where is the Arun-3 Hydroelectric Project locaed?+

Q2. What is the installed capacity of the Arun-3 Hydroelectric Project?+

Q3. Which company is developing the Arun-3 Hydroelectric Project?+

Tags: arun-3 hydroelectric project prelims pointers upsc current affairs upsc prelims current affairsprelims pointers

UPSC GS Course 2027
UPSC GS Course 2027
₹1,80,000
Enroll Now
GS Foundation Course 2 Yrs
GS Foundation Course 2 Yrs
₹2,45,000
Enroll Now
UPSC Mentorship Program
UPSC Mentorship Program
₹69000
Enroll Now
UPSC Sureshot Mains Test Series
UPSC Sureshot Mains Test Series
₹27000
Enroll Now
Prelims Powerup Test Series
Prelims Powerup Test Series
₹14000
Enroll Now
Enquire Now