SHANTI Act and India’s Nuclear Energy Roadmap

The SHANTI Act marks a major overhaul of India’s nuclear laws, reshaping liability rules, and private participation.

SHANTI Act and India’s Nuclear Energy Roadmap

SHANTI Act Latest News

  • Parliament has enacted the Sustainable Harnessing and Advancement of Nuclear Energy for Transforming India (SHANTI) Act, replacing older nuclear laws to accelerate nuclear power expansion and attract private participation. 

India’s Nuclear Energy Programme: Background

  • Nuclear energy has been a strategic component of India’s long-term energy planning since independence. 
  • Guided by Homi Bhabha’s three-stage nuclear programme, India sought energy security while overcoming its limited uranium reserves by eventually using thorium, which is abundantly available domestically.
  • At present, nuclear power contributes about 3% of India’s electricity generation, with an installed capacity of 8.8 GW, making it a relatively small but stable and low-carbon energy source. 
  • However, meeting India’s growing electricity demand while transitioning to clean energy has renewed focus on expanding nuclear power alongside renewables.
  • Before the new Act, India’s nuclear sector was governed by two major laws:
    • Atomic Energy Act, 1962, which restricted nuclear power generation to public sector entities
    • Civil Liability for Nuclear Damage (CLND) Act, 2010, which imposed liability not only on operators but also allowed recourse against equipment suppliers
  • While the CLND Act aimed to protect citizens in case of nuclear accidents, its supplier liability clause discouraged foreign and private companies from investing in India’s nuclear sector. 
  • This became a major bottleneck after the 2008 Indo-US civil nuclear agreement, as international reactor manufacturers remained wary of legal exposure. 

Key Features of the Act

  • The SHANTI Act repeals both earlier laws and introduces a consolidated legal framework for nuclear energy development. 
  • Its core objective is to scale up nuclear capacity to 100 GW by 2047, increasing nuclear power’s share in India’s energy mix.
  • A major shift under SHANTI is opening the sector to private companies and facilitating foreign investment, while maintaining state oversight on safety and regulation. 
  • State-owned utilities are expected to add around 54 GW, with the remaining capacity likely coming from private players.

Changes in Nuclear Liability Provisions

  • Safety and liability lie at the heart of nuclear regulation. Under international norms, nuclear plant operators are strictly liable for damages, with immediate compensation to victims, irrespective of fault.
  • The earlier CLND Act allowed operators to seek compensation from suppliers if equipment defects caused an accident. 
  • SHANTI removes this supplier liability clause and even eliminates the explicit reference to “suppliers,” thereby addressing long-standing concerns of foreign reactor manufacturers.
  • The Act introduces a graded liability system based on plant capacity:
    • Rs. 3,000 crore for plants above 3,600 MW
    • Rs. 1,500 crore for 1,500-3,600 MW
    • Rs. 750 crore for 750-1,500 MW
    • Rs. 300 crore for 150-750 MW
    • Rs. 100 crore for plants below 150 MW
  • This graded approach aims to reduce risk perception and encourage private investment, though concerns remain about the adequacy of compensation in severe accidents. 

Regulatory Structure and Safety Oversight

  • The SHANTI Act gives statutory backing to the Atomic Energy Regulatory Board (AERB), strengthening its legal status. 
  • However, the Union government continues to control key aspects such as licensing and appointments, raising questions about regulatory independence.
  • Given global nuclear disasters like Chernobyl (1986) and Fukushima (2011), safety oversight remains critical, and India’s cautious regulatory approach reflects these historical lessons.

Nuclear Expansion and Small Modular Reactors

  • To meet its ambitious targets, India plans to rely significantly on Small Modular Reactors (SMRs)
  • These reactors are smaller, factory-built units that can be assembled on-site, potentially reducing construction time.
  • However, SMRs require enriched uranium-235, which India lacks in sufficient quantities, and they do not directly support India’s long-term thorium-based vision. 
  • They are also costlier per unit of electricity and do not fundamentally solve the problem of radioactive waste.
  • Meanwhile, India’s Fast Breeder Reactor, essential for moving to the second stage of the three-stage programme, has faced repeated delays and is now expected to be commissioned only by 2026.

Source : TH

Latest UPSC Exam 2025 Updates

Last updated on December, 2025

→ Check out the latest UPSC Syllabus 2026 here.

→ Join Vajiram & Ravi’s Interview Guidance Programme for expert help to crack your final UPSC stage.

UPSC Mains Result 2025 is now out.

UPSC Notification 2026 is scheduled to be released on January 14, 2026.

UPSC Calendar 2026 is released on 15th May, 2025.

→ The UPSC Vacancy 2025 were released 1129, out of which 979 were for UPSC CSE and remaining 150 are for UPSC IFoS.

UPSC Prelims 2026 will be conducted on 24th May, 2026 & UPSC Mains 2026 will be conducted on 21st August 2026.

→ The UPSC Selection Process is of 3 stages-Prelims, Mains and Interview.

UPSC Result 2024 is released with latest UPSC Marksheet 2024. Check Now!

UPSC Prelims Result 2025 is out now for the CSE held on 25 May 2025.

UPSC Toppers List 2024 is released now. Shakti Dubey is UPSC AIR 1 2024 Topper.

UPSC Prelims Question Paper 2025 and Unofficial Prelims Answer Key 2025  are available now.

UPSC Mains Question Paper 2025 is out for Essay, GS 1, 2, 3 & GS 4.

UPSC Mains Indian Language Question Paper 2025 is now out.

UPSC Mains Optional Question Paper 2025 is now out.

→ Also check Best IAS Coaching in Delhi

SHANTI Act FAQs

Q1. What is the SHANTI Act?+

Q2. Why was the CLND Act seen as restrictive?+

Q3. What nuclear capacity does India aim to achieve under SHANTI?+

Q4. How does SHANTI change nuclear liability rules?+

Q5. Are Small Modular Reactors central to India’s nuclear plans?+

Tags: mains articles shanti act upsc current affairs upsc mains current affairs

Vajiram Mains Team
Vajiram Mains Team
At Vajiram & Ravi, our team includes subject experts who have appeared for the UPSC Mains and the Interview stage. With their deep understanding of the exam, they create content that is clear, to the point, reliable, and helpful for aspirants.Their aim is to make even difficult topics easy to understand and directly useful for your UPSC preparation—whether it’s for Current Affairs, General Studies, or Optional subjects. Every note, article, or test is designed to save your time and boost your performance.
UPSC GS Course 2026
UPSC GS Course 2026
₹1,75,000
Enroll Now
GS Foundation Course 2 Yrs
GS Foundation Course 2 Yrs
₹2,45,000
Enroll Now
UPSC Mentorship Program
UPSC Mentorship Program
₹65000
Enroll Now
UPSC Sureshot Mains Test Series
UPSC Sureshot Mains Test Series
₹25000
Enroll Now
Prelims Powerup Test Series
Prelims Powerup Test Series
₹13000
Enroll Now
Enquire Now