Dorjilung Hydroelectric Power Project Latest News
Tata Power Company Ltd recently said it has signed commercial agreements with Druk Green Power Corporation Ltd (DGPC) for the development of the 1,125 MW Dorjilung hydroelectric power project in Bhutan.
About Dorjilung Hydroelectric Power Project
- It is a planned 1125 MW run-of-river project situated in the eastern Lhuentse and Mongar Districts of Bhutan on the Kurichhu River, a tributary of the Drangmechhu that flows into India.
- At a height of approximately 139.5 m, the concrete-gravity dam channels nearly 287 m3/s through a 15 km headrace tunnel to an underground powerhouse housing six Francis turbines, designed to generate around 4.5 terawatt-hours (TWh) annually.
- At a total project cost of ₹13,100 crore, Dorjilung will be Bhutan’s second-largest hydropower project, and the largest Public–Private Partnership (PPP) hydro project ever undertaken in the country.
- The project is financed by the World Bank.
- In November 2024, Bhutan’s Druk Green Power Corporation (DGPC) signed an MoU with Tata Power Company Limited for the joint development of the project.
- The Project will be implemented through a Special Purpose Vehicle (SPV), with DGPC and Tata Power holding equity shares of 60% and 40%, respectively.
- The project is expected to be commissioned by early 2032.
Source: CNBC
Last updated on January, 2026
→ Check out the latest UPSC Syllabus 2026 here.
→ Join Vajiram & Ravi’s Interview Guidance Programme for expert help to crack your final UPSC stage.
→ UPSC Mains Result 2025 is now out.
→ UPSC Notification 2026 is scheduled to be released on January 14, 2026.
→ UPSC Calendar 2026 has been released.
→ UPSC Prelims 2026 will be conducted on 24th May, 2026 & UPSC Mains 2026 will be conducted on 21st August 2026.
→ The UPSC Selection Process is of 3 stages-Prelims, Mains and Interview.
→ Prepare effectively with Vajiram & Ravi’s UPSC Prelims Test Series 2026 featuring full-length mock tests, detailed solutions, and performance analysis.
→ Enroll in Vajiram & Ravi’s UPSC Mains Test Series 2026 for structured answer writing practice, expert evaluation, and exam-oriented feedback.
→ Join Vajiram & Ravi’s Best UPSC Mentorship Program for personalized guidance, strategy planning, and one-to-one support from experienced mentors.
→ UPSC Result 2024 is released with latest UPSC Marksheet 2024. Check Now!
→ UPSC Toppers List 2024 is released now. Shakti Dubey is UPSC AIR 1 2024 Topper.
→ Also check Best UPSC Coaching in India
Dorjilung Hydroelectric Power Project FAQs
Q1. Dorjilung Hydroelectric Power Project is being developed on which river in Bhutan?+
Q2. What is the planned power generation capacity of the Dorjilung Hydroelectric Project?+
Q3. What type of hydropower project is Dorjilung?+
Q4. Which Indian company signed an MoU with Bhutan’s Druk Green Power Corporation for the development of the project?+
Tags: dorjilung hydroelectric power project prelims pointers upsc current affairs upsc prelims current affairs