INS Nilgiri Latest News
INS Nilgiri recently joined the Eastern Naval Command and would be an integral part of the Eastern Sword-Sunrise Fleet.
About INS Nilgiri
- It is the first of the indigenously built Project 17A stealth frigates of the Indian Navy.
- It is designed by the Indian Navy’s Warship Design Bureau and built at the Mazagon Dock Shipbuilders Limited (MDL), Mumbai.
- The Nilgiri class is a design derivative of the indigenous Shivalik class stealth frigates (Project 17).
- Other Ships in the Class: The remaining six frigates — Himgiri, Taragiri, Udaygiri, Dunagiri, Vindhyagiri, and Mahendragiri— are under construction at Mazagon Dock Shipbuilders Limited (MDL), Mumbai, and Garden Reach Shipbuilders and Engineers (GRSE), Kolkata.
- INS Nilgiri would be an integral part of the Eastern Naval Command.
INS Nilgiri Features
- INS Nilgiri is 149 meters long, with a displacement of approximately 6,670 tonnes.
- It is powered by a sophisticated combined diesel and gas (CODAG) propulsion system.
- It can achieve speeds of up to 28 knots.
- The warship is enabled to operate independently without supporting vessels and to function as the flagship of the Naval task force.
- Armed with 16 Barak-8 Surface-to-Air Missiles, INS Nilgiri offers strong anti-aircraft protection.
- Additionally, it includes 8 BrahMos missiles for anti-ship and surface-to-surface combat.
- The radar systems on board include MF-STAR for 360-degree cover, 3D AESA radar for the tracking of multi-targets, and Nishant radar for targeting.
- The Combat Management System (CMS) integrates all systems, which enables the smooth execution of network-centric warfare and cooperative operations with other platforms.
Source: TH
Last updated on January, 2026
→ Check out the latest UPSC Syllabus 2026 here.
→ Join Vajiram & Ravi’s Interview Guidance Programme for expert help to crack your final UPSC stage.
→ UPSC Mains Result 2025 is now out.
→ UPSC Notification 2026 is scheduled to be released on January 14, 2026.
→ UPSC Calendar 2026 has been released.
→ UPSC Prelims 2026 will be conducted on 24th May, 2026 & UPSC Mains 2026 will be conducted on 21st August 2026.
→ The UPSC Selection Process is of 3 stages-Prelims, Mains and Interview.
→ Prepare effectively with Vajiram & Ravi’s UPSC Prelims Test Series 2026 featuring full-length mock tests, detailed solutions, and performance analysis.
→ Enroll in Vajiram & Ravi’s UPSC Mains Test Series 2026 for structured answer writing practice, expert evaluation, and exam-oriented feedback.
→ Join Vajiram & Ravi’s Best UPSC Mentorship Program for personalized guidance, strategy planning, and one-to-one support from experienced mentors.
→ UPSC Result 2024 is released with latest UPSC Marksheet 2024. Check Now!
→ UPSC Toppers List 2024 is released now. Shakti Dubey is UPSC AIR 1 2024 Topper.
→ Also check Best UPSC Coaching in India
INS Nilgiri FAQs
Q1. What is INS Nilgiri?+
Q2. INS Nilgiri belongs to which project of the Indian Navy?+
Q3. INS Nilgiri was built at which shipyard?+
Q4. What type of propulsion system is used in INS Nilgiri?+
Tags: ins nilgiri prelims pointers upsc current affairs upsc prelims current affairs



