Jal Jeevan Mission: Progress, Funding Challenges and the Road Ahead

The Jal Jeevan Mission, India’s flagship rural water supply scheme, has achieved significant milestones but now seeks additional funds to meet its ambitious goals.

Jal Jeevan Mission: Progress, Funding Challenges and the Road Ahead

What’s in Today’s Article?

  • Jal Jeevan Mission Latest News
  • Introduction
  • Overview of Jal Jeevan Mission
  • Current Funding Status and Concerns
  • Role of States and Local Governance
  • Challenges in Last-Mile Delivery
  • Policy Outlook and Next Steps
  • Jal Jeevan Mission FAQs

Jal Jeevan Mission Latest News

  • The Jal Shakti Ministry has demanded Rs 2.79 lakh crore Central funds to complete the Jal Jeevan Mission Scheme.

Introduction

  • Launched in August 2019, the Jal Jeevan Mission (JJM) is the Government of India’s ambitious initiative to provide Functional Household Tap Connections (FHTCs) to every rural household
  • Spearheaded by the Ministry of Jal Shakti, the mission aims to ensure equitable access to safe and adequate drinking water to all rural households by 2024. 
  • In the years since its launch, JJM has made remarkable strides but now faces funding constraints as it nears its final implementation phase.

Overview of Jal Jeevan Mission

  • Vision and Objectives
    • The mission’s core objective is to ensure “Har Ghar Jal”, water to every household, by provisioning safe and adequate drinking water through individual tap connections by 2024. It aims to:
      • Provide 55 litres per capita per day (lpcd) of water
      • Promote sustainable water supply systems
      • Ensure community participation and transparency
      • Integrate source sustainability and greywater management
  • Progress and Achievements So Far
    • As of March 31, 2025, nearly 14.56 crore rural households (about 73%) have been provided with tap water connections under JJM.
    • 13 states and Union Territories, including Goa, Haryana, Gujarat, and Telangana, have achieved 100% coverage.
    • 2.12 lakh villages have been declared “Har Ghar Jal certified” where every household has a functional tap water connection.
    • 6.2 lakh village-level water and sanitation committees have been formed to ensure local involvement and monitoring.

Current Funding Status and Concerns

  • Demand for Additional Funds
    • According to media reports, the Ministry of Jal Shakti has sought an additional ₹2.79 lakh crore from the 16th Finance Commission to sustain and complete the Jal Jeevan Mission. 
    • However, the Finance Commission’s interim panel has only cleared a support of ₹1.42 lakh crore, roughly half the requested amount.
  • Breakdown of Financial Requirement
    • The original outlay for the mission was ₹3.60 lakh crore (Centre and State combined).
    • As of now, the Centre has allocated around ₹1.58 lakh crore and disbursed ₹1.12 lakh crore.
    • The demand for additional funds stems from increased costs due to inflation, coverage expansion, and the need for operation and maintenance systems.
  • Implications of Funding Gap
    • The reduced approval of funds could delay coverage in lagging states such as Uttar Pradesh, West Bengal, and Rajasthan, all of which are still under 60% coverage. 
    • It also raises concerns over sustainability, particularly for maintenance and source sustainability projects post-2024.

Role of States and Local Governance

  • A defining feature of JJM is its emphasis on community participation. 
  • Village Water and Sanitation Committees (VWSCs) are responsible for operation, maintenance, and regular monitoring. 
  • Capacity-building efforts include training over 4 lakh women in water quality testing using field test kits. 
  • States are also required to prepare village action plans (VAPs) to ensure decentralised planning and execution.

Challenges in Last-Mile Delivery

  • Geographical Diversity: Hilly and tribal regions such as those in the Northeast and Chhattisgarh pose logistical challenges.
  • Water Source Sustainability: In drought-prone areas, source depletion remains a critical issue.
  • Human Resource Gaps: The mission has faced shortfalls in trained manpower at the village and block levels for technical and managerial roles.
  • Water Quality Issues: Fluoride, arsenic, and iron contamination continue to affect the potability of water in certain states.

Policy Outlook and Next Steps

  • Focus Beyond 2024
    • Even though 2024 was the initial deadline, the government now appears focused on strengthening long-term water supply infrastructure. Key next steps include:
      • Setting up Water Quality Monitoring and Surveillance systems.
      • Implementing greywater reuse mechanisms.
      • Transitioning to lifecycle-based budgeting for O&M.
      • Encouraging convergence with MGNREGA and SBM 2.0 for integrated water security.
  • Strategic Recommendations
    • Increase central allocations through alternate routes such as multilateral aid or CSR partnerships.
    • Prioritise lagging states with targeted assistance.
    • Improve convergence with health and nutrition schemes to reinforce the water-health link.

Jal Jeevan Mission FAQs

Q1. What is the core goal of the Jal Jeevan Mission?

Ans. To provide tap water supply to every rural household by 2024.

Q2. How many households have been connected under JJM so far?

Ans. Over 14.5 crore rural households have functional tap connections as of March 2025.

Q3. Why did the Jal Shakti Ministry seek more funds recently?

Ans. Due to rising costs, wider coverage needs, and post-implementation sustainability efforts.

Q4. Which states have achieved 100% tap water connectivity?

Ans. Goa, Haryana, Gujarat, and Telangana are among the states with full coverage.

Q5. What is the role of Village Water and Sanitation Committees under JJM?

Ans. VWSCs handle local implementation, maintenance, and monitoring of water supply systems.

Source: IE | PIB

Latest UPSC Exam 2025 Updates

Last updated on June, 2025

UPSC Notification 2025 was released on 22nd January 2025.

UPSC Prelims Result 2025 is out now for the CSE held on 25 May 2025.

UPSC Prelims Question Paper 2025 and Unofficial Prelims Answer Key 2025  are available now.

UPSC Calendar 2026 is released on 15th May, 2025.

→ The UPSC Vacancy 2025 were released 1129, out of which 979 were for UPSC CSE and remaining 150 are for UPSC IFoS.

UPSC Mains 2025 will be conducted on 22nd August 2025.

UPSC Prelims 2026 will be conducted on 24th May, 2026 & UPSC Mains 2026 will be conducted on 21st August 2026.

→ The UPSC Selection Process is of 3 stages-Prelims, Mains and Interview.

UPSC Result 2024 is released with latest UPSC Marksheet 2024. Check Now!

UPSC Toppers List 2024 is released now. Shakti Dubey is UPSC AIR 1 2024 Topper.

→ Also check Best IAS Coaching in Delhi

Vajiram Editor
Vajiram Editor
UPSC GS Course 2026
UPSC GS Course 2026
₹1,75,000
Enroll Now
GS Foundation Course 2 Yrs
GS Foundation Course 2 Yrs
₹2,45,000
Enroll Now
UPSC Prelims Test Series
UPSC Prelims Test Series
₹6000
Enroll Now
UPSC Mains Test Series
UPSC Mains Test Series
₹16000
Enroll Now
UPSC Mentorship Program
UPSC Mentorship Program
₹85000
Enroll Now
Enquire Now