The NERPSIP Scheme or North Eastern Region Power System Improvement Project is an initiative aimingA at strengthening the intra-state transmission and distribution systems in India’s North-Eastern Region (NER). Initially the project got approved in December 2014 by the Government of India, this scheme is a crucial step toward addressing the challenges related to the Distribution Infrastructure and increasing its economic growth.
NERPSIP Scheme History
The origins of NERPSIP Scheme can be noticed in the Pasighat Proclamation on Power during the North Eastern Council’s Sectoral Summit in 2007. This summit emphasized the urgent need to enhance transmission, sub-transmission, and distribution systems in the NER and Sikkim. Following these recommendations, a comprehensive plan was developed by the Central Electricity Authority (CEA) in collaboration with POWERGRID and the respective state governments.
NERPSIP Scheme Implementation
NERPSIP Scheme is a Central Government Scheme under the Ministry of Power. The project is jointly funded by the Government of India and the World Bank on a 50:50 basis, except for the Rs. 89 crore allocated for capacity building, which is fully funded by the Government of India.
The scheme’s total project cost, originally estimated at Rs. 5,111.33 crore, was revised to Rs. 6,700 crore in December 2020. POWERGRID, a Maharatna company under the Ministry of Power, serves as the implementing agency in collaboration with six beneficiary states:
- Assam
- Manipur
- Meghalaya
- Mizoram
- Nagaland
- Tripura
NERPSIP Scheme Key Objectives
NERPSIP Scheme Key Objectives include:
- Establishing a reliable and efficient power grid to improve electricity connectivity to emerging load centers.
- Increasing the overall economic growth of the region by increasing per capita power consumption and creating employment opportunities.
- Ensuring all categories of consumers benefit from grid-connected power systems.
NERPSIP Scheme Impact
NERPSIP Scheme is more than just a power project; it is a transformative initiative aimed at addressing long-standing energy deficits in the North Eastern Region. Some of the NERPSIP Scheme Impact include:
- The creation of a power grid that reduces dependency on diesel generators and improves access to electricity.
- The project’s implementation involves hiring local skilled and unskilled labor, generating substantial job opportunities.
- Comprehensive Scheme for Arunachal Pradesh and Sikkim
- In addition to the NERPSIP Scheme, the Government of India approved a separate project for Arunachal Pradesh and Sikkim in October 2014, initially estimated at Rs. 4,754.42 crore and later revised to Rs. 9,129.32 crore.
- This scheme is funded by the Government of India, highlighting its strategic importance in strengthening power infrastructure in the remotest regions of India.
Last updated on July, 2025
→ UPSC Notification 2025 was released on 22nd January 2025.
→ UPSC Prelims Result 2025 is out now for the CSE held on 25 May 2025.
→ UPSC Prelims Question Paper 2025 and Unofficial Prelims Answer Key 2025 are available now.
→ UPSC Calendar 2026 is released on 15th May, 2025.
→ The UPSC Vacancy 2025 were released 1129, out of which 979 were for UPSC CSE and remaining 150 are for UPSC IFoS.
→ UPSC Mains 2025 will be conducted on 22nd August 2025.
→ UPSC Prelims 2026 will be conducted on 24th May, 2026 & UPSC Mains 2026 will be conducted on 21st August 2026.
→ The UPSC Selection Process is of 3 stages-Prelims, Mains and Interview.
→ UPSC Result 2024 is released with latest UPSC Marksheet 2024. Check Now!
→ UPSC Toppers List 2024 is released now. Shakti Dubey is UPSC AIR 1 2024 Topper.
→ Also check Best IAS Coaching in Delhi
NERPSIP Scheme FAQs
Q1. What is the full form of Nerpsip?+
Q2. What is the North East Development Scheme?+
Q3. Who is the minister of North East Development?+
Q4. Which is the largest state in north east India?+
Tags: NERPSIP Scheme