Salal Hydroelectric Project Latest News
The Union Minister of Power and Housing and Urban Affairs recently directed sediment removal at the Salal Power Project in Jammu and Kashmir to ensure maximum utilisation of water resources, in the wake of the Indus Waters Treaty being kept in abeyance between India and Pakistan.
About Salal Hydroelectric Project
- It is a 690 MW run-of-the-river power project on the Chenab River in the Reasi District of Jammu and Kashmir.
- Although the plan for a water reservoir was originally conceived in pre-independent India, the planning of the project started in the 1960s.
- The project construction commenced in 1970 and subsequently entered into commercial operation in 1987.
- The project is developed and owned by National Hydroelectric Power Corporation (NHPC).
- This was the first hydropower project, which was built by India under the Indus Water Treaty regime in Kashmir.
- Salal Dam is 130 meters high with an elevation of 1627 feet above mean sea level.
- Jammu and Kashmir receives 12.5 percent of the energy generated from the project.
- The rest is transmitted to the Northern Grid, where it is distributed to the states of Punjab, Haryana, Delhi, Himachal Pradesh, Rajasthan, and Uttar Pradesh.
- Jammu and Kashmir also purchases additional power at regular prices.
Source: TH
Last updated on January, 2026
→ Check out the latest UPSC Syllabus 2026 here.
→ Join Vajiram & Ravi’s Interview Guidance Programme for expert help to crack your final UPSC stage.
→ UPSC Mains Result 2025 is now out.
→ UPSC Notification 2026 is scheduled to be released on January 14, 2026.
→ UPSC Calendar 2026 has been released.
→ UPSC Prelims 2026 will be conducted on 24th May, 2026 & UPSC Mains 2026 will be conducted on 21st August 2026.
→ The UPSC Selection Process is of 3 stages-Prelims, Mains and Interview.
→ Prepare effectively with Vajiram & Ravi’s UPSC Prelims Test Series 2026 featuring full-length mock tests, detailed solutions, and performance analysis.
→ Enroll in Vajiram & Ravi’s UPSC Mains Test Series 2026 for structured answer writing practice, expert evaluation, and exam-oriented feedback.
→ Join Vajiram & Ravi’s Best UPSC Mentorship Program for personalized guidance, strategy planning, and one-to-one support from experienced mentors.
→ UPSC Result 2024 is released with latest UPSC Marksheet 2024. Check Now!
→ UPSC Toppers List 2024 is released now. Shakti Dubey is UPSC AIR 1 2024 Topper.
→ Also check Best UPSC Coaching in India
Salal Hydroelectric Project FAQs
Q1. Where is Salal Hydroelectric Project located?+
Q2. What is the installed capacity of the Salal Hydroelectric Project?+
Q3. When did the Salal Hydroelectric Project become commercially operational?+
Q4. Which organization developed and owns the Salal Hydroelectric Project?+
Tags: prelims pointers salal hydroelectric project upsc current affairs upsc prelims current affairs