About Shahpur Kandi Dam Project
- It is located on the Ravi River in Pathankot district, Punjab, downstream from the existing Ranjit Sagar Dam.
- The water released by Ranjit Sagar Dam is utilized for generating power from this project.
- The main purpose behind the construction of this dam is power generation and irrigation in Punjab and J&K States.
- It is constructed by the irrigation department of the Government of Punjab.
- The project consists of a 55.5 m high concrete gravity dam, a 7.70 km long hydel channel, two head regulators, and two powerhouses.
- The total output capacity of the project is 206 MW.
Key Facts about Ravi River
- It is a trans-boundary river of India and Pakistan.
- It is one of the five tributaries of the Indus River that give the Punjab (meaning “Five Rivers”) its name.
- Origin: It originates in the western Himalayas in the Multhan tehsil of the Kangra district of Himachal Pradesh.
- It then flows through the Indian state of Punjab and enters Pakistan, where it eventually joins the Chenab River in the province of Punjab.
- Length: The total length of the Ravi River is approximately 720 kilometers (447 miles). Around 158 kilometers (98 miles) of the river’s course lie in India, and the remaining 562 kilometers (349 miles) flow through Pakistan.
- It is also called ‘The River of Lahore’ since that city is situated on its eastern bank.
- Tributaries: The Ravi River is fed by several tributaries, including the Bhadal, the Ujh, the Tarnah, and the Basantar rivers in India, and the Aik, the Bara, and the Beas rivers in Pakistan.
- Indus Water Treaty of Ravi River: The water of the rivers Ravi, Beas, and Sutlej is allocated to India under the Indus Water Treaty between India and Pakistan.
Q1) What is the Indus Water Treaty?
It was signed in September 1960 between India and Pakistan. The treaty was brokered by the World Bank, which, too, is a signatory to the treaty. The treaty fixed and delimited the rights and obligations of both countries concerning the use of the waters of the Indus River system. It gives control over the waters of the three “eastern rivers’ — the Beas, Ravi, and Sutlej — to India, while control over the waters of the three “western rivers’ ‘ — the Indus, Chenab, and Jhelum — to Pakistan.
Source: India Halts Flow Of Ravi River To Pakistan, Say Reports: Here’s What We Know So Far
Last updated on June, 2025
→ UPSC Notification 2025 was released on 22nd January 2025.
→ UPSC Prelims Result 2025 is out now for the CSE held on 25 May 2025.
→ UPSC Prelims Question Paper 2025 and Unofficial Prelims Answer Key 2025 are available now.
→ UPSC Calendar 2026 is released on 15th May, 2025.
→ The UPSC Vacancy 2025 were released 1129, out of which 979 were for UPSC CSE and remaining 150 are for UPSC IFoS.
→ UPSC Mains 2025 will be conducted on 22nd August 2025.
→ UPSC Prelims 2026 will be conducted on 24th May, 2026 & UPSC Mains 2026 will be conducted on 21st August 2026.
→ The UPSC Selection Process is of 3 stages-Prelims, Mains and Interview.
→ UPSC Result 2024 is released with latest UPSC Marksheet 2024. Check Now!
→ UPSC Toppers List 2024 is released now. Shakti Dubey is UPSC AIR 1 2024 Topper.
→ Also check Best IAS Coaching in Delhi