Vishnugad Pipalkoti Hydro Electric Project (VPHEP)

Vishnugad Pipalkoti Hydro Electric Project (VPHEP) is a run-of-river hydropower scheme being developed on the Alaknanda River in the Chamoli district of Uttarakhand. Read more about Vishnugad Pipalkoti Hydro Electric Project, River, Capacity, News.

Vishnugad Pipalkoti Hydro Electric Project

Vishnugad Pipalkoti Hydro Electric Project (VPHEP) Latest News

Around 60 people were injured after a loco train carrying workers and officials hit a goods train inside the Pipalkoti tunnel of the Vishnugad–Pipalkoti Hydroelectric Project recently.

About Vishnugad Pipalkoti Hydro Electric Project (VPHEP)

  • It is a run-of-river hydropower scheme being developed on the Alaknanda River (a major tributary of the Ganga River) in the Chamoli district of Uttarakhand.
  • With an installed capacity of 444 MW (4 × 111 MW) and a gross head of approximately 237 metres, VPHEP is designed to provide peaking power to India’s Northern Grid.
  • The project, when completed, will generate an estimated 1,665 gigawatt-hours (or million kilowatt-hours) of electricity in a typical year. 
  • The project includes a 65-meter diversion dam, a 13.4-km headrace tunnel, a 3-km tailrace tunnel, and an underground powerhouse. 
  • All water diverted from the river will be returned to the river approximately 18 km after the point of diversion. 
  • It is being developed by THDC India Ltd (formerly Tehri Hydro Development Corporation Limited) and financed by a US$ 648 million loan from the World Bank.
    • THDC is a joint venture between the government of India and the government of Uttar Pradesh.

Source: TOI

Latest UPSC Exam 2026 Updates

Last updated on January, 2026

→ Check out the latest UPSC Syllabus 2026 here.

→ Join Vajiram & Ravi’s Interview Guidance Programme for expert help to crack your final UPSC stage.

UPSC Mains Result 2025 is now out.

UPSC Notification 2026 is scheduled to be released on January 14, 2026.

UPSC Calendar 2026 is released on 15th May, 2025.

UPSC Prelims 2026 will be conducted on 24th May, 2026 & UPSC Mains 2026 will be conducted on 21st August 2026.

→ The UPSC Selection Process is of 3 stages-Prelims, Mains and Interview.

UPSC Result 2024 is released with latest UPSC Marksheet 2024. Check Now!

UPSC Toppers List 2024 is released now. Shakti Dubey is UPSC AIR 1 2024 Topper.

→ Also check Best IAS Coaching in Delhi

Vishnugad Pipalkoti Hydro Electric Project (VPHEP) FAQs

Q1. On which river is the Vishnugad Pipalkoti Hydro Electric Project being developed?+

Q2. What type of hydropower project is the Vishnugad Pipalkoti Hydro Electric Project?+

Q3. What is the total installed capacity of the Vishnugad Pipalkoti Hydro Electric Project?+

Q4. Which agency is developing the Vishnugad Pipalkoti Hydro Electric Project?+

Tags: vishnugad pipalkoti hydro electric project (vphep)

Vajiram Prelims Team
Vajiram Prelims Team
At Vajiram & Ravi, our team includes subject experts who have appeared for the UPSC Mains and the Interview stage. With their deep understanding of the exam, they create content that is clear, to the point, reliable, and helpful for aspirants.Their aim is to make even difficult topics easy to understand and directly useful for your UPSC preparation—whether it’s for Current Affairs, General Studies, or Optional subjects. Every note, article, or test is designed to save your time and boost your performance.
UPSC GS Course 2026
UPSC GS Course 2026
₹1,75,000
Enroll Now
GS Foundation Course 2 Yrs
GS Foundation Course 2 Yrs
₹2,45,000
Enroll Now
UPSC Mentorship Program
UPSC Mentorship Program
₹85000
Enroll Now
UPSC Sureshot Mains Test Series
UPSC Sureshot Mains Test Series
₹19000
Enroll Now
Prelims Powerup Test Series
Prelims Powerup Test Series
₹8500
Enroll Now
Enquire Now