What is India’s Nuclear Power Programme?

India’s Nuclear power program is a 3-staged program aimed to utilise vast Thorium reserves in India.

What is India’s Nuclear Power Programme?
Table of Contents

India has a 3-stage nuclear programme.

  • The 3-stage nuclear programme is developed with the aim of utilizing the vast Thorium reserves in India (about 25% of the world)
  • Besides India has limited availability of Uranium reserves (about 2% of the world’s uranium reserves)
  • 1st Stage
    • Pressurized Heavy Water Reactors are based on natural uranium that contains 99.3% U-238 and 0.7% U-235.
    • U-235 being fissile sets up the chain reaction and U-238 being non-fissile gets converted to Pu-239 as a byproduct (spent fuel) which is in turn used in the Fast Breeder Reactors in the 2nd
  • 2nd Stage
    • Fast Breeder Reactors are primarily based on Plutonium.
    • Further the breeder reactors use mix of Plutonium-239 produced in the 1st stage and U-238 that is abundantly found on earth to produce Plutonium inside the reactor.
      • Note that U-238 is not fissile material and thus cannot set up chain reaction.
    • Since the amount of Plutonium produced inside the reactor is more than that initially used, it is called Breeder reactor.
    • In order to increase the probability of neutron hitting U-238, these reactors do not use a moderator to slow down neutrons and thus they are called Fast Breeder Reactors.
    • Once the Plutonium-239 is completely used, Thorium is introduced in the reactor to convert it into U-233 that will be used in 3rd
  • 3rd Stage
    • Thermal Breeder Reactors uses U-233 that is produced in the 2nd stage using thorium-232.
    • Thorium is also not radioactive and thus not fissile.
    • Since these reactors also produce U-233 out of Thorium-232 they are called breeder reactors.
    • India has abundant thorium reserves in the form of monazite sand, and therefore the 3rd stage is critical for India’s nuclear energy basket.

 


Q1) Presently, how many nuclear reactors are operating in India?

Presently, India has 22 operating reactors, with an installed capacity of 6780 MWe. Among these eighteen reactors are Pressurised Heavy Water Reactors (PHWRs) and four are Light Water Reactors (LWRs).

Source: The Hindu

Update Icon
Latest UPSC Exam 2026 Updates

Date IconLast updated on March, 2026

UPSC Final Result 2025 is now out.

→ UPSC has released UPSC Toppers List 2025 with the Civil Services final result on its official website.

Anuj Agnihotri secured AIR 1 in the UPSC Civil Services Examination 2025.

UPSC Marksheet 2025 is now out.

UPSC Notification 2026 & UPSC IFoS Notification 2026 is now out on the official website at upsconline.nic.in.

UPSC Calendar 2026 has been released.

→ Check out the latest UPSC Syllabus 2026 here.

UPSC Prelims 2026 will be conducted on 24th May, 2026 & UPSC Mains 2026 will be conducted on 21st August 2026.

→ The UPSC Selection Process is of 3 stages-Prelims, Mains and Interview.

→ Prepare effectively with Vajiram & Ravi’s UPSC Prelims Test Series 2026 featuring full-length mock tests, detailed solutions, and performance analysis.

→ Enroll in Vajiram & Ravi’s UPSC Mains Test Series 2026 for structured answer writing practice, expert evaluation, and exam-oriented feedback.

→ Join Vajiram & Ravi’s Best UPSC Mentorship Program for personalized guidance, strategy planning, and one-to-one support from experienced mentors.

Shakti Dubey secures AIR 1 in UPSC CSE Exam 2024.

→ Also check Best UPSC Coaching in India

Vajiram Content Team
Vajiram Content Team
UPSC GS Course 2026
UPSC GS Course 2026
₹1,75,000
Enroll Now
GS Foundation Course 2 Yrs
GS Foundation Course 2 Yrs
₹2,45,000
Enroll Now
UPSC Mentorship Program
UPSC Mentorship Program
₹85000
Enroll Now
UPSC Sureshot Mains Test Series
UPSC Sureshot Mains Test Series
₹19000
Enroll Now
Prelims Powerup Test Series
Prelims Powerup Test Series
₹8500
Enroll Now
Enquire Now