About Chenab Rail Bridge
- Location: It is located between Bakkal and Kauri in the Reasi district of Jammu and Kashmir (J&K).
- The 1.3-km-long bridge is located 359 metres above the Chenab riverbed.
- It is the highest single-arch railway bridgein the world.
- It is part of the Udhampur-Srinagar-Baramulla Rail Link project.
- The construction of the Chenab bridge has been a collaborative effort, involving various international organizations and renowned Indian institutions, including the Indian Institutes of Technology (IITs), the Defence Research and Development Organisation (DRDO), and the Geological Survey of India.
- Features:
- It consists of 17 spans, with the main arch spanning an impressive 467 metres, making it the longest of its kind.
- The arch consists of steel boxes. Concrete has been filled in the boxes to improve stability.
- The bridge consists of 93 deck segments, each weighing approximately 85 tonnes.
- The bridge has been designed with a life span of 120 years.
- It has been designed to withstand high wind speeds of up to 266 Kmph.
- It is built to be ‘blast-proof’ and is capable of withstanding the nation’s maximum intensity zone-V earthquake forces.
Key Facts about Chenab River
- It is a major river of India and Pakistan.
- It is a tributary of the Indus River.
- Course:
- Origin: It is formed by the confluence of two streams, Chandra and Bhaga, at Tandi in the upper Himalayasin the Lahaul and Spiti Districts of Himachal Pradesh.
- In its upper reaches, it is also known as the Chandrabhaga.
- It flows west through Jammu and Kashmir union territory, between the steep cliffs of the Siwalik Range (south) and the Lesser Himalayas (north).
- Turning southwest, it continues into Pakistan, descending from the uplands into the broad alluvial lowlands of Punjab province.
- After receiving the Jhelum River near Trimmu, the Chenab empties into the Sutlej River, a tributary of the Indus River.
- Its total length is about 605 miles (974 km), and it feeds several irrigation canals.
- Tributaries: The tributaries of the Chenab River include Miyar Nalla, Sohal, Thirot, Bhut Nalla, Marusudar, and Lidrari.
Q1: What is the Udhampur-Srinagar-Baramulla Rail Link project?
The USBRL Project involves the construction of a railway line from Udhampur to Baramulla joining the Kashmir valley with the Indian Railways network. It aims to connect Kashmir to the rest of the country and give a push to development in the Valley.
Source: Times of India
Last updated on June, 2025
→ UPSC Notification 2025 was released on 22nd January 2025.
→ UPSC Prelims Result 2025 is out now for the CSE held on 25 May 2025.
→ UPSC Prelims Question Paper 2025 and Unofficial Prelims Answer Key 2025 are available now.
→ UPSC Calendar 2026 is released on 15th May, 2025.
→ The UPSC Vacancy 2025 were released 1129, out of which 979 were for UPSC CSE and remaining 150 are for UPSC IFoS.
→ UPSC Mains 2025 will be conducted on 22nd August 2025.
→ UPSC Prelims 2026 will be conducted on 24th May, 2026 & UPSC Mains 2026 will be conducted on 21st August 2026.
→ The UPSC Selection Process is of 3 stages-Prelims, Mains and Interview.
→ UPSC Result 2024 is released with latest UPSC Marksheet 2024. Check Now!
→ UPSC Toppers List 2024 is released now. Shakti Dubey is UPSC AIR 1 2024 Topper.
→ Also check Best IAS Coaching in Delhi