Damodar River Latest News
In what locals have described as a miraculous escape, a 65-year-old woman who was swept away by the swollen Damodar River was rescued nearly 45 km downstream in West Bengal recently.
About Damodar River
- The Damodar River flows through the states of Jharkhand and West Bengal.
- Located in the eastern part of the Indian subcontinent, it is an important part of the Ganges River System.
- The river is also known as the “Sorrow of Bengal” because of its devastating floods in the plains of West Bengal.
- Course:
- It originates from the Palamau hills of Chota Nagpur in Jharkhand.
- From its source, the river flows in a southeastern direction, passing through the Chota Nagpur Plateau, a region known for its rich mineral deposits.
- In its lower course, it flows through West Bengal’s plains and is joined by several tributaries.
- Finally, the Damodar River meets the Hooghly River at Shayampur, which is 48 km from Kolkata.
- Total Length: 592 km
- The basin has a total catchment area of 25,820 sq.km.
- The Damodar River has several tributaries, including:
- Barakar River
- Konar River
- Jamunia River
- Bokaro River
- Sali River
- Ghari River
- Guaia River
- Khadia River
- Bhera River
- Damodar Valley Project:
- It is a significant river valley project in Eastern India, implemented to supply hydroelectric power to West Bengal and Bihar, as well as to prevent floods effectively.
- The project is operated by the Damodar Valley Corporation (DVC), an undertaking of the Indian Government established in July 1948.
- It is situated on the Konar River in the district of Hazaribagh in Jharkhand.
Source: NIE
Last updated on November, 2025
→ Check out the latest UPSC Syllabus 2026 here.
→ Join Vajiram & Ravi’s Interview Guidance Programme for expert help to crack your final UPSC stage.
→ UPSC Mains Result 2025 is now out.
→ UPSC Notification 2026 is scheduled to be released on January 14, 2026.
→ UPSC Calendar 2026 is released on 15th May, 2025.
→ The UPSC Vacancy 2025 were released 1129, out of which 979 were for UPSC CSE and remaining 150 are for UPSC IFoS.
→ UPSC Prelims 2026 will be conducted on 24th May, 2026 & UPSC Mains 2026 will be conducted on 21st August 2026.
→ The UPSC Selection Process is of 3 stages-Prelims, Mains and Interview.
→ UPSC Result 2024 is released with latest UPSC Marksheet 2024. Check Now!
→ UPSC Prelims Result 2025 is out now for the CSE held on 25 May 2025.
→ UPSC Toppers List 2024 is released now. Shakti Dubey is UPSC AIR 1 2024 Topper.
→ UPSC Prelims Question Paper 2025 and Unofficial Prelims Answer Key 2025 are available now.
→ UPSC Mains Question Paper 2025 is out for Essay, GS 1, 2, 3 & GS 4.
→ UPSC Mains Indian Language Question Paper 2025 is now out.
→ UPSC Mains Optional Question Paper 2025 is now out.
→ Also check Best IAS Coaching in Delhi
Damodar River FAQs
Q1. Damodar River flows through which Indian states?+
Q2. The Damodar River is a part of which major river system in India?+
Q3. Why is the Damodar River often referred to as the “Sorrow of Bengal”?+
Q4. From where does the Damodar River originate?+
Tags: damodar river prelims pointers upsc current affairs upsc prelims current affairs



