Next-Gen Launch Vehicle

Next Generation Launch Vehicle will have 3 times the present payload capability with 1.5 times the cost compared to LVM3, and will also have reusability resulting in low-cost access to space and modular green propulsion systems.

Next-Gen Launch Vehicle

About Next Generation Launch Vehicle: 

  • It will have 3 times the present payload capability with 1.5 times the cost compared to LVM3, and will also have reusability resulting in low-cost access to space and modular green propulsion systems.
  • The development of the NGLV is taken up which is designed to have a maximum payload capability of 30 tonnes to Low Earth Orbit, which also has a reusable first stage.
  • This development project will be implemented with maximal participation from the Indian industry, which is also expected to invest in the manufacturing capacity at the outset itself, thereby allowing a seamless transition to the operational phase subsequent to the development.
  • NGLV will be demonstrated with three development flights (D1, D2 & D3) with a target of 96 months (8 years) for the completion of the development phase.
  • The total fund approved is Rs. 8240.00 Crore and includes the development costs, three developmental flights, essential facility establishment, Programme Management and Launch Campaign.
  • Significance
    • It will enable national & commercial missions including launch of human spaceflight missions to Bharatiya Antariksh Station.
    • Lunar/inter-planetary exploration missions along with communication & earth observation satellite constellations to Low Earth Orbit that will benefit the entire space ecosystem in the country.
    • This project will boost the Indian space ecosystem in terms of capability and capacity.

Q1: What is the Launch Vehicle Mark-3 (LVM3)?

It is India’s most powerful launcher built entirely with domestic technology. With two large strap-on boosters providing high thrust on lift-off and a cryogenic upper stage, it can launch 4-ton class satellites to geostationary transfer orbit.

Source: New Re-usable Low-cost launch vehicle for Bharat

Latest UPSC Exam 2026 Updates

Last updated on January, 2026

→ Check out the latest UPSC Syllabus 2026 here.

→ Join Vajiram & Ravi’s Interview Guidance Programme for expert help to crack your final UPSC stage.

UPSC Mains Result 2025 is now out.

UPSC Notification 2026 Postponed for CSE & IFS which was scheduled to be released on 14 January 2026.

UPSC Calendar 2026 has been released.

UPSC Prelims 2026 will be conducted on 24th May, 2026 & UPSC Mains 2026 will be conducted on 21st August 2026.

→ The UPSC Selection Process is of 3 stages-Prelims, Mains and Interview.

→ Prepare effectively with Vajiram & Ravi’s UPSC Prelims Test Series 2026 featuring full-length mock tests, detailed solutions, and performance analysis.

→ Enroll in Vajiram & Ravi’s UPSC Mains Test Series 2026 for structured answer writing practice, expert evaluation, and exam-oriented feedback.

→ Join Vajiram & Ravi’s Best UPSC Mentorship Program for personalized guidance, strategy planning, and one-to-one support from experienced mentors.

UPSC Result 2024 is released with latest UPSC Marksheet 2024. Check Now!

UPSC Toppers List 2024 is released now. Shakti Dubey is UPSC AIR 1 2024 Topper.

→ Also check Best UPSC Coaching in India

Vajiram Content Team
Vajiram Content Team
UPSC GS Course 2026
UPSC GS Course 2026
₹1,75,000
Enroll Now
GS Foundation Course 2 Yrs
GS Foundation Course 2 Yrs
₹2,45,000
Enroll Now
UPSC Mentorship Program
UPSC Mentorship Program
₹85000
Enroll Now
UPSC Sureshot Mains Test Series
UPSC Sureshot Mains Test Series
₹19000
Enroll Now
Prelims Powerup Test Series
Prelims Powerup Test Series
₹8500
Enroll Now
Enquire Now