Next-Gen Launch Vehicle

Next Generation Launch Vehicle will have 3 times the present payload capability with 1.5 times the cost compared to LVM3, and will also have reusability resulting in low-cost access to space and modular green propulsion systems.

Next-Gen Launch Vehicle

About Next Generation Launch Vehicle: 

  • It will have 3 times the present payload capability with 1.5 times the cost compared to LVM3, and will also have reusability resulting in low-cost access to space and modular green propulsion systems.
  • The development of the NGLV is taken up which is designed to have a maximum payload capability of 30 tonnes to Low Earth Orbit, which also has a reusable first stage.
  • This development project will be implemented with maximal participation from the Indian industry, which is also expected to invest in the manufacturing capacity at the outset itself, thereby allowing a seamless transition to the operational phase subsequent to the development.
  • NGLV will be demonstrated with three development flights (D1, D2 & D3) with a target of 96 months (8 years) for the completion of the development phase.
  • The total fund approved is Rs. 8240.00 Crore and includes the development costs, three developmental flights, essential facility establishment, Programme Management and Launch Campaign.
  • Significance
    • It will enable national & commercial missions including launch of human spaceflight missions to Bharatiya Antariksh Station.
    • Lunar/inter-planetary exploration missions along with communication & earth observation satellite constellations to Low Earth Orbit that will benefit the entire space ecosystem in the country.
    • This project will boost the Indian space ecosystem in terms of capability and capacity.

Q1: What is the Launch Vehicle Mark-3 (LVM3)?

It is India’s most powerful launcher built entirely with domestic technology. With two large strap-on boosters providing high thrust on lift-off and a cryogenic upper stage, it can launch 4-ton class satellites to geostationary transfer orbit.

Source: New Re-usable Low-cost launch vehicle for Bharat

Latest UPSC Exam 2026 Updates

Last updated on February, 2026

UPSC Notification 2026 is now out on the official website at upsconline.nic.in.

UPSC IFoS Notification 2026 is now out on the official website at upsconline.nic.in.

UPSC Calendar 2026 has been released.

→ Check out the latest UPSC Syllabus 2026 here.

→ Join Vajiram & Ravi’s Interview Guidance Programme for expert help to crack your final UPSC stage.

UPSC Mains Result 2025 is now out.

UPSC Prelims 2026 will be conducted on 24th May, 2026 & UPSC Mains 2026 will be conducted on 21st August 2026.

→ The UPSC Selection Process is of 3 stages-Prelims, Mains and Interview.

→ Prepare effectively with Vajiram & Ravi’s UPSC Prelims Test Series 2026 featuring full-length mock tests, detailed solutions, and performance analysis.

→ Enroll in Vajiram & Ravi’s UPSC Mains Test Series 2026 for structured answer writing practice, expert evaluation, and exam-oriented feedback.

→ Join Vajiram & Ravi’s Best UPSC Mentorship Program for personalized guidance, strategy planning, and one-to-one support from experienced mentors.

UPSC Result 2024 is released with latest UPSC Marksheet 2024. Check Now!

UPSC Toppers List 2024 is released now. Shakti Dubey is UPSC AIR 1 2024 Topper.

→ Also check Best UPSC Coaching in India

Vajiram Content Team
Vajiram Content Team
UPSC GS Course 2026
UPSC GS Course 2026
₹1,75,000
Enroll Now
GS Foundation Course 2 Yrs
GS Foundation Course 2 Yrs
₹2,45,000
Enroll Now
UPSC Mentorship Program
UPSC Mentorship Program
₹85000
Enroll Now
UPSC Sureshot Mains Test Series
UPSC Sureshot Mains Test Series
₹19000
Enroll Now
Prelims Powerup Test Series
Prelims Powerup Test Series
₹8500
Enroll Now
Enquire Now