About Uri-I Hydroelectric Project:
- It is an operating hydroelectric power plant located in the Jhelum River of Uri town in the Baramulla district of Jammu & Kashmir.
- It is located very near the Line of Control (LOC), the de facto border between India and Pakistan.
- The power project was commissioned in 1997 with a total installed capacity of 480 MW.
- It is owned by the Central Government, and the operating company of the plant is National Hydroelectric Power Corporation Limited (NHPC).
- The unit size of the power plant is 480 MW, having 4 units of 120 MW each.
Key Facts about Jhelum River:
- It is a river that flows in India and Pakistan.
- It is a tributary of the Indus River.
- It is the main waterway of the Kashmir valley.
- It is the largest and most western of the five rivers of Punjab and passes through the Jhelum District in the north of Punjab province, Pakistan.
- Course:
- Origin: It originates at the Verinag Spring at Anantnag, at the foot of the Pir Panjal range in the Kashmir Valley.
- It then flows via Srinagar and Wular Lake prior to entering Pakistan.
- The river makes a deep, narrow gorge on its way to Pakistan.
- It joins the Chenab River near Trimmu, Pakistan.
- Length: It has a total length of about 725 km (450 mi).
- Major Tributaries:
- The largest tributary of the Jhelum is the Kishenganga (Neelum) River, which joins near Muzaffarabad and enters the Punjab province, Pakistan.
- Kunhar River is the second largest tributary of the river, which connects Pakistan-occupied Kashmir (PoK) and Pakistan on the Kohala Bridge of Kanghan valley.
- Other tributaries include the Sandran River, Bringi River, Arapath River, Watlara River, Lidder River, and Veshaw River.
Q1: Which are the main tributaries of the Jhelum River?
The largest tributary of the Jhelum is the Kishenganga (Neelum) River, which joins near Muzaffarabad and enters the Punjab province, Pakistan. Kunhar River is the second largest tributary of the river, which connects Pakistan-occupied Kashmir (PoK) and Pakistan on the Kohala Bridge of Kanghan valley. Other tributaries include Sandran River, Bringi River, Arapath River, Watlara River, Lidder River and Veshaw River.
Source: EAC defers proposal for grant of EC to Stage-II of Uri-I Hydroelectric Project
Last updated on January, 2026
→ Check out the latest UPSC Syllabus 2026 here.
→ Join Vajiram & Ravi’s Interview Guidance Programme for expert help to crack your final UPSC stage.
→ UPSC Mains Result 2025 is now out.
→ UPSC Notification 2026 is scheduled to be released on January 14, 2026.
→ UPSC Calendar 2026 is released on 15th May, 2025.
→ UPSC Prelims 2026 will be conducted on 24th May, 2026 & UPSC Mains 2026 will be conducted on 21st August 2026.
→ The UPSC Selection Process is of 3 stages-Prelims, Mains and Interview.
→ UPSC Result 2024 is released with latest UPSC Marksheet 2024. Check Now!
→ UPSC Toppers List 2024 is released now. Shakti Dubey is UPSC AIR 1 2024 Topper.
→ Also check Best IAS Coaching in Delhi



