About INS Shalki:
- It is a Shishumar-class diesel-electric submarine.
- It is also the first-ever submarine that was built in India.
- It was constructed under licence by the Mazgaon Dock Limited in Mumbai.
- It was commissioned into the Indian Navy on 7 February 1992.
- Specifications:
- It has a 6.5 m (21 ft) beam, 6 m (20 ft) draught, and is 64.4 m (211 ft) in length.
- It carries40 people on board including 8 officers.
- The displacement of INS Shalki is 1450 tons on surfaces, 1850 tons submerged.
- Its range is snorting8,000 nautical miles (15,000 km) at 8 kn (15 km/h).
- The speed ranges from 11 knots surfaced (i.e., 20 km/h) and 22 knots submerged (41 km/h).
Q1: What is INS Arighat (S3)?
It is an upgraded variant of the Arihant-class submarine. It is the second nuclear-powered ballistic missile submarine being built by India under the Advanced Technology Vessel (ATV) project. It can accommodate more K4 missiles than S2.
Source: Indian Navy submarine INS Shalki arrives in Colombo for formal visit
Last updated on June, 2025
→ UPSC Notification 2025 was released on 22nd January 2025.
→ UPSC Prelims Result 2025 is out now for the CSE held on 25 May 2025.
→ UPSC Prelims Question Paper 2025 and Unofficial Prelims Answer Key 2025 are available now.
→ UPSC Calendar 2026 is released on 15th May, 2025.
→ The UPSC Vacancy 2025 were released 1129, out of which 979 were for UPSC CSE and remaining 150 are for UPSC IFoS.
→ UPSC Mains 2025 will be conducted on 22nd August 2025.
→ UPSC Prelims 2026 will be conducted on 24th May, 2026 & UPSC Mains 2026 will be conducted on 21st August 2026.
→ The UPSC Selection Process is of 3 stages-Prelims, Mains and Interview.
→ UPSC Result 2024 is released with latest UPSC Marksheet 2024. Check Now!
→ UPSC Toppers List 2024 is released now. Shakti Dubey is UPSC AIR 1 2024 Topper.
→ Also check Best IAS Coaching in Delhi